Jump to content

Recommended Posts

It's great that there are new pavements round the bottom of the park, but it must have cost a fortune.

Generally speaking the Parks department is great but I've been walking round the park for donkeys years and they've never bothered me.

Was it money well spent? Or was there a special reason for doing it?

Link to comment
https://www.eastdulwichforum.co.uk/topic/185525-new-pavements-in-dulwich-park/
Share on other sites

Mick Mac Wrote:

-------------------------------------------------------

> Yet most of Lordship Lane, which sees heavy use

> and has nice bars and restaurants to sit outside,

> still waits for new paving.



I expect they'll choose to do Lordship when it causes the least disruption eg. school holidays. Not.

Just had a look at the new pavement works at the top of Lordship Lane,Chener Books side, where it gets to Goose Green.

Strange to see one pile of slightly used square paving stones being replaced with new ones and the kerb stones being replaced with slightly higher ones.

Given that the council is broke - seems odd that money is being spent on cosmetic work to Lordship Lane. If you look over the road the pavement and kerbs are perfectly usable although paving has sunk a little.

Wonder what's going on?


Mind how you go in the icy weather!

End of March is often the end of the financial year and budgets have to be spent, or lost.

Possibly this is Southwark's year end - I don't know but guessing it's the case.


Any company with surplus at the end of the year - which it spends on non-critical items, is demonstrating a lack of financial acumen and poor planning of its resources.

i*Rate Wrote:

-------------------------------------------------------

> Just had a look at the new pavement works at the

> top of Lordship Lane,Chener Books side, where it

> gets to Goose Green.

> Strange to see one pile of slightly used square

> paving stones being replaced with new ones and the

> kerb stones being replaced with slightly higher

> ones.

> Given that the council is broke - seems odd that

> money is being spent on cosmetic work to Lordship

> Lane. If you look over the road the pavement and

> kerbs are perfectly usable although paving has

> sunk a little.

> Wonder what's going on?

>

> Mind how you go in the icy weather!


To James Barber...


James, would you like to comment on this as I have looked at what is being doe (at great expense) and the end result will be little different.

Meanwhile we have traffic disruption and the bus stop is out of commission.

  • 1 month later...
Was cycling through Dulwich Park this week where a lot of the pavement resurfacing is complete. As part of the work, they have repositioned the kerbstones. But there are no dropped kerbs along the entire southside run. If you are pushing a wheelchair along the pavement or road and want to get to a bench, or cross to the pavilion, it?s going to be tough. While the workmen are still there, is there any way to get a few dropped kerbs or ramps added every 100m or so.
A buggy with a light child, yes. A wheelchair would struggle - and the kerbs are now a 3 inch drop rather than the half-inch or so they were before. The difference between an old and new section is quite startling. I did wonder whether the old ones were so low that it wasn't a consideration in putting in any dropped sections.
The wide ?Road? from Court Lame Gate through to Dulwich Village has no pavements at all. It is quite dangerous I think, speaking as a pedestrian, when cyclists come up behind you. Most are very careful but there are quite a few who cycle at speeds much greater than the 5mph I think they are allowed. Should not new pavements be installed along this route?

Jennys Wrote:

-------------------------------------------------------

> The wide ?Road? from Court Lame Gate through to

> Dulwich Village has no pavements at all. It is

> quite dangerous I think, speaking as a pedestrian,

> when cyclists come up behind you. Most are very

> careful but there are quite a few who cycle at

> speeds much greater than the 5mph I think they are

> allowed. Should not new pavements be installed

> along this route?


But then where there are pavements the rest of the way round, the vast majority of pedestrians don't use them. AS THEY ARE ENTITLED NOT TO DO (before the anti-cyclist lobby start). So might be a bit of a waste of money installing them? Perhaps a better, and far cheaper alternative, would be to simply paint a cycle lane down one side of the road; in other shared use spaces, for example in Hyde Park, this works fine, I never see cyclists riding on the (much wider) pedestrian only section.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • I think it's a good idea and follows the example of other towns/areas. As it says in the article, the area around the main tourist attractions in Southwark, that is The Globe, Southwark Cathedral, Tate Modern and the whole walking route from London Bridge to Blackfriars, takes a lot of maintaining and it shouldn't be a burden on regular council tax payers like us. 
    • Turn your used stamps into vital funds to support human rights around the world.   How it works: Simply send us your stamps and we'll then sort through them to sell or auction. We accept all stamps of all origin and value – both used and new. Foreign and commemorative ones are likely to be worth the most. Please leave at least half centimetre of paper around the stamps Send your stamps to: FAO Robin Sandow c/o The Post Room Amnesty International UK 2nd Floor, Peter Benenson House, 1 Easton Street, London, WC1X 0DW Recycle your stamps.AIUK.pdf
    • Also, if he enjoys design or drawing (alongside his maths & tech) he might like the Greenpeace competition for a poster (see Lounge post) - 5 days left to enter. Something more for some time at home, but ...
    • Deadline in 5 days! Important Dates 🗓 Submission deadline: 25 July 2025 🗳 Public voting opens: 7 August 2025 🚢 Winners announced: 15 August 2025   Time is running out! There are only 5 days left to submit your design for Greenpeace’s poster competition. This is your chance to help send a powerful, creative message across Europe: We must stop fossil gas, oil and coal and move toward a fossil-free future. No matter your skill level, everyone is welcome. Whether you're sketching by hand, designing on a screen, or crafting a collage, we want to see your vision. 🎨 The 3 winning designs will receive:     A printed full-size poster of your artwork     50 postcards of your design     An exclusive Greenpeace campaign t-shirt   How to enter     Design your poster     Use any style you like – hand-drawn, painted, digital, collaged. Just make sure it’s original and fits our message.     Submit your design     Upload a photo or file using the form on this page. You’ll need to include your name and contact email.     Vote for your favourites     After the submission deadline, we’ll shortlist poster designs that you can vote for! Share the voting page with your friends so you have a better chance to win.     Your poster in the European Parliament and on the Arctic Sunrise The top-voted design will be sent to all members of the European Parliament as postcards. The three designs with the most votes will be printed as posters and postcards, and will be part of the Arctic Sunrise ship tour this fall. As a winner, you will get printed versions of your poster and a Greenpeace t-shirt.    Direct link: https://www.greenpeace.org/international/act/send-your-poster-design/?utm_campaign=fff-ban-new-fossil-fuel-projects&utm_source=hs-email&utm_medium=email&utm_content=fff-poster-design-contest-3rd-email-2025-07-20&utm_term=2025-07-20-poster-design-contest-3rd-email-button-2&global_project=fossil-free-future Time is running out! There are only 5 days left to submit your design for Greenpeace’s poster competition. This is your chance to help send a powerful, creative message across Europe: We must stop fossil gas, oil and coal and move toward a fossil-free future. No matter your skill level, everyone is welcome. Whether you're sketching by hand, designing on a screen, or crafting a collage, we want to see your vision. 🎨 The 3 winning designs will receive:     A printed full-size poster of your artwork     50 postcards of your design     An exclusive Greenpeace campaign t-shirt The deadline is 25 July 2025. After that, we’ll shortlist the top designs and the public will vote for the winners. Don't wait and join today! Join the competition now 
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...