Jump to content

Recommended Posts

But the plans to remove 3 of the 9 terminatin platforms will be painful if granted planning approval and would see the end of the South London Line.

Weirdly London Bridge could reinstate 3 past cloased terminating platforms but seem to prefer long distance commuting into London Bridge rather than Southwark residents commuters.

I was walking along St Thomas Street towards the station the other day - the station area being to my right being just one big red brick wall, just east of Weston Street where it goes through the tunnel - and I came across a slope going up where cars can go, so - thinking I might be using a cut-through or short cut - I walked up it. Security Guard very politely asked if I worked in one of the shops as this slope is for cars and the workers often come out this way for a smoke. I started talking with him and he said that in the not too distant future, whilst the brick wall facade will be kept, that whole area will be knocked through and turned in to shopping and eating area.


Didn't get a train home - looking forward to seeing the differences you all describe though!

You get a good view of much of the building work including new track if you catch the train to Charing X from Platform 6. Having wandered around the immediate area on foot, must say that the project management of road and site traffic seems exemplary.


The only negative is that Guy's Tower has started looking very shabby and overlooked...

Hi Jeremy,

The plan Network Rail have is to increas the number of through Thameslink platforms from 6 to 9 - hence the new viaduct across Borough High Street and to make space reduce the number of terminating platforms from 9 to 6.

What they could do is reinstate 3 terminating platforms that have been used as a station and Network Rail staff car park since the 70's. Naivelly I would imaginje a train company would prefer space for trains over parked cars!

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • You'd need to get a proper quote (or three) for instance removing a cast iron bath is a very different job from removing an acrylic one. Again what pipe work will be being joined into - matching old imperial pipes with modern metric ones is different from like to like, as is dealing with a copper or an iron distribution system. The amount (area) of retiling required is an issue, as will be the state of the wall behind the tiles. It may of course all be very plain sailing, or not. Have a first look at plumber recommendations on the relevant pages on this site. If it's all easy then 3 days work may be sufficient. But it could be a week if there are snags. 
    • Hi. Can anyone suggest a plumber for the job below? Replace bath tub with a shower enclosure, putting pipes to showerhead behind wall, re-titling damaged/removed tiles Also any idea of the costs involved for the labour as we will buy the items required?
    • Aria came round to fix my tub drain when I'd messed up the seal. Came within hours, fixed the tub, and ran a bath to make sure it was okay. Here's where the fun starts. While he was over, I asked him questions about the rest of the plumbing round the house. I had just moved into a Victorian home that was previously being rented. Unsurprisingly, we found another leak in the tub and a drip in the kitchen tap.  He came back the next day to put a better pipe in my bathtub and replace the kitchen sink. Painstakingly figured out how to replace the hard-to-access kitchen sink without cutting through the wood panel with the help of his builder friend, Mark. Answered all my questions and clearly knew his stuff. All this right before Christmas holidays! 
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...