Maybe something for Cleaner Greener Safer next year (this year's applications are under consideration at the moment).


In terms of the works on the roundabout itself, I'm sure everyone agrees that it is important that the works on the roundabout are done in safe conditions for the people doing the works. This is why

traffic management is required for the repairs to be implemented.

Renata

I think that it is quite refreshing to hear the views of another councillor on the forum rather than being subjected to the biased dribble that is often churned out by the local Lib Dem councillor. The latter whose view, in times of financial difficulties, is that the way to help a business that has run into difficulties is for the council to buy the premises, knock it down, and make Burgess Park bigger.

Hi Eddie,

You must be referring to my recent blog where I suggest the council consider approaching an architecrual salvage yard that sadly burnt down a week ago. The council in the past had thought of asking about buying this land as it blocks access to a sizeable slice of Burgess Park.

My interest in Burgess Park is that a number of my past relatives homes and businesses are under the grass ie. demolished to make way for the park.


Sorry you feel this is dribble.

  • 4 weeks later...

A meeting was held on site with the contractor and representatives from London Transport to finalise the timings of the works and to discuss the appropriate traffic management.The works will now commence on Tuesday 10 April and should be completed within 3-4 days dependent on weather (up to Sunday 15th if weather is poor). This is at the suggestion of London Transport due to the Easter school break and the perceived lower demand on their services. A further advantage of this way of working is that the working time will be increased as there will be no need to remove and replace the required temporary road closures each day.



The traffic management will comprise three way traffic lights on the roundabout with temporary road closures of Spurling Road (two way access only from Crawthew Grove), Tintagel Crescent (access only from Elsie Road) and the minor

East Dulwich Road (access only from Adys Road).


It is appreciated that there may be some significant traffic disruption during the works. Consequently, there will be signage erected well in advance of the work start date, and a letter advising residents and businesses of the work proposals is going out within the next few days.


Renata

Thanks Renata but you've missed out some important information.

Letters to all nearby residents and businesses will be hand delivered on Monday 2 April.


That should anyone have queries during the works or concerns then in the first instance please direct them to FMConway the Site Supervisor ? Sam Redington on 0208 636 8822.


If you get no joy ten please contact me as ones of the East Dulwich ward Councillors.

Any idea what they are actually going to do? Seems a lot of disruption for what is actually needed.


As a nearby resident, I received notification from FM Conway about it in the post with detailed maps of where the workzones will be ... interestingly dated October 2010 ! 3 way traffic signals so I suggest avoiding the area for the period they are working on it.

Adding about 20 mins to northbound bus journeys this morning (Wednesday).


From the letter from the contractor: "works will be carried out between 7am and 6.30pm. The longer working hours are to ensure we can complete in the shortest possible time and minimise the traffic disruption."


They obviously haven't told their staff as there was nothing onsite apart from a pile of bricks at either of these times last night or this morning.

Hi bigdavid,

Really sorry to hear this.

If you witness this again please do complain to the contractors rep Sam Redington on 020 8636 8822.

I've certainly raised this with council officials - but they are the same officials that thought the... shall we say zealous traffic controls were necessary which do appear OTT.

And be careful when using the pedestrian crossings; southbound traffic is going anti-clockwise through the roundabout and briefly along the right-hand lane of LL before cutting back to the left.


So where you used to look right, look left, and vice versa. Or something like that. Anyway, take care.

Work is definitely underway now, repairing the brick wall on the side of the roundabout. Looks like they have about three quarters of the broken bits done.


Long queues of traffic in north, south and east directions of course. Goose Green side road and Tintagel Crescent have been blocked off, presumably against rat-running. Sunny day, so hopefully work will be finished soon.

I've just been assured most of the works will be completed Thursday afternoon and just a short period Friday morning to finish the works. With a following wind all done on Thursday. Weather depending - I'm going to now stop hoping for rain until Friday afternoon.


Of course if the right equipment had turned up yesterday at 7am and today at 7am they'd have gained another 6 hours work completed and be finishing lunch time tomorrow. And if the temporary lights hadnt developed a fault yesterday afternoon they'd be finishing today.


I'm taking a deep breath to calm myself after typing that.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • Sure, ChatGPT never ceases to amaze.
    • Chatgpt is a joy (and scary)  No Water on Barry Road" (to the tune of No Woman, No Cry) (Verse 1) No water… on Barry Road No water… on Barry Road Said, I remember, when we used to flow In the tap by the old front gate Oba served us clear, sweet water Then it vanished like fate And then the plumber would come in the evening Fixing pipes, sayin’, "Just hold tight" But every time we checked the faucet It was still a dusty fight (Chorus) No water… (no water) On Barry Road (on Barry Road) No water… yeah On Barry Road (Verse 2) I see the buckets lined up outside Hope in every pail we hold The sun be blazing, the kids be crying And the kettle’s running cold Good friends we had, and good friends we lost To the drought along the way In this bright future, we can't forget the past But we sure need water today (Chorus) No water… no flowin’ tide On Barry Road… we stand and sigh No water… but we still survive On Barry Road… we still try (Bridge) Oh, dry days will pass, I know Pipe dreams gotta start to flow But until then we wait and pray For rain or trucks to come our way (Final Chorus) No water… (no water) On Barry Road (on Barry Road) No water… no pride But still we rise… (It refused to sing it for me) 
    • Hubby had to retire from work due to serious ill health which had meant he was off work for several months at a time. His hospital consultant advised part time employment only, Signed on at Job Centre and asked them to send him on courses, especially IT has not computer literate or had a computer. Job Centre refused and insisted he applied for full time work even though he produced medical evidence from hospital and letter from previous employment detailing the reason why had medically retired him. He applied for the (then) disability allowance but was refused as not disabled enough and the fact he could work part time. Applied f or several part time jobs but when they knew of his medical history turned him down. That was 18 years ago. Disabled people who want  to work find it hard to find employment. I studied Disability and Employment in Holland as part of my degree and found at that time, the Dutch system more flexible. If a disabled person found a job part time, they still received a portion of their benefit as well as wages. If found a full time position, benefit suspended and were subject to regular reviews as to how they performed in  the job. If there were no problems, benefit was withdrawn, however if they found the work was not suited to their disability - they gave up work and went straight back to receiving their full benefit. If a disabled person finds employment, their benefits stop immediately. If they cannot maintain the work and are sacked, getting back onto benefits is very difficult, Give those who are able to work at least part time, the opportunity to have reduced benefits to top up wages.
    • Trickle of cold water this morning, but by 3 pm we have both hot and cold water with normal pressure, Hopefully this will continue.
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...