Jump to content

Recommended Posts

Over the past week, I've noticed a lot more heavy vehicles (lorries and big soil transporters) coming out of the side roads down from Barry Road onto Lordship Lane.


It's possibly due to the road works at the corner of Peckham Rye / East Dulwich Road but strikes me as dangerous as the side roads aren't wide enough for such heavy vehicles and pedestrians wouldn't expect them.


Are others noticing the same?

Link to comment
https://www.eastdulwichforum.co.uk/topic/307778-heavy-traffic-using-side-roads/
Share on other sites

Traffic or rather the roadworks in various locations are causing traffic gridlock.


i) Brenchley Gardens, pavement widening works ongoing between Forest Hill Road and Kelvington Road


ii) Further major roadworks at the junction of East Dulwich Road and Peckham Rye (The Kings Arms Junction in all four directions temp traffic lights), casing huge delays and creating traffic tailbacks.


iii) Rye Lane, as stated above by the station, more temporary traffic lights and more queuing traffic


iv) "Forest Hill Road, SE22, Routes 63, 363, N63: Road is closed due to a burst water main. Buses are on diversion. 63 will not serve stops between Peckham Rye / East Dulwich Road and Therapia Road. 363 and N63 will not serve stops between Friern Road and Underhill Road."


Effectively no bus service from the bottom of Barry Road to Woodvale till the Barracks Lordship Lane, then onto Crystal Palace. It's NOW beyond a joke.


How many times do Thames Water need to do a repair to a water main, if memory serves me right, did they just recently replace the water main on Forest Hill Road, can't they do ANYTHING which lasts?????


v) Peckham Hill Street, looked like further works are about to begin


No notification on bus stops that the P13 is on diversion, waited 20 mins by side of Primark, then had to detour up to the top of Barry Road and back down Lordship Lane, it's chaos out there.


Being cynical for a moment, it was the end of the financial year so the Council are spending (wasting money on a number of daft schemes i.e. Benchley Garden road narrowing scheme, absolute and total madness. This morning traffic was queuing back down Brenchley Gardens into Forest Hill Road BOTH ways.


WHAT ARE THE COUNCILLORS DOING ABOUT ANY OF THIS??????????????????????????

Jazzer

Just had a similar conversation about end of year budget and the concept of "pre election" was raised (as in look what we are doing to improve things)


No idea if there's a correlation or not but it was an interesting point.


Also why were the Rye Lane roadworks not done when the lane was closed to all traffic is a mystery 🤔

Had a nice chat with Thames Water including the million dollar question why we have so many water mains problems around here. The engineers were new to the area and unaware, for example, that FHR had been closed at least once in recent months for the water mains.


As Underhill has lights on it at the moment, meaning drivers are even worse than normal - that is driving standards, I've cycled via Goodrich Road. Hell, so many drivers 30mph plus. This is a schools area. Even more reason to close school roads


Didn't notice any heavy vehicles. A snapshot not a scientific survey.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • A new roadmap (surely railmap?!) for rail accessibility has been published: https://www.gov.uk/government/publications/accessible-railways-roadmap It says "approximately 56% of stations and around 66% of the 1.3 billion journeys that take place on the network have step-free access to platforms...  "£373 million has been committed over the next 5 years to deliver Access for All projects, providing step-free access from station entrances to and between platforms, alongside other essential accessibility upgrades. These works, together, will increase the number of step-free stations across Great Britain from 56% to 58%. "This improvement will make travel easier with step-free access available at stations covering an increased share of total rail journeys – from 66% up to 71%" Don't know what that means for us here: upgrading Peckham Rye would cover a lot of rail journeys but the cost has no doubt increased from the £40m figure previously quoted. So that would eat into a lot of the funding.
    • It's not really though, is it. It's practical.  At least we're allowed Christmas lights.
    • We are the only specialist floor insulation company on the market to focus on insulating from below – meaning almost zero mess, disruption or noise! Warmdwell is extremely proud to receive the highest reviews for our professionalism, reliability, commitment and the all-round ease of doing business with us: we draw our team from professional, creative, educated backgrounds to provide a friendly, problem-solving team with the deepest integrity. We take real care of your home and aim to leave it as spotless as possible. Please check our Google Reviews to speak for us: "We were really pleased with their quote, communication, and with having the job done perfectly with almost zero disruption. We think they left the space cleaner than when they arrived, and we are definitely already getting the effects of a warmer room" – Miriam & Abed, Sevenoaks, Oct 2025 "Laurence and his team were extremely polite & helpful, and the work was performed over just 2 days with minimal disruption. It was absolutely the most relaxed work I have ever had performed on the house!" – Alistair, Cambridge, July 2025 "Extremely friendly, polite and efficient" – Diane, Forest Hill, June 2025 We are always keen to chat through your floor insulation options and provide as much free advice as we can, as well as free quotes and surveys – so why not ask us today about what is possible to protect your floors from the cold ventilation air blowing underneath, keep your heat in and warm up your home? We use high-performance mineral wool slabs, never foam, for so many reasons: it is the ideal flexible material for the irregularities of old floors; is breathable, working with the way your floor has successfully performed for perhaps 100 years or more; can easily be removed to access pipes and cables; and is completely non-combustible. A local business based in Crystal Palace, we work extensively around Dulwich, Herne Hill, Forest Hill, Lewisham, Tooting, Balham and across the south East of England. Please ask us about your floor insulation options or for local project case studies today! Phone Number: 02080792793 Email Address: [email protected] Website: https://warmdwell.co.uk/ View full listing
    • I would recommend the Dulwich Test and Service centre that used to be in Hindemanns road and then moved to the little Trading Estate off Tyrrel Road. I've used them very happily for nearly 40 years. Paul and Reg Shires. 
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...