Jump to content

Recommended Posts

For those the many who use Dulwich and Sydenham Hill Woods, be aware that from today, access via Cox’s Walk will be closed from the Grove Tavern entrance. This is to allow heavy machinery to move along Cox’s Walk to the bridge which is being rebuilt. It looks from the attached map that this applies also to the Lapsewood Walk entrance, where it seems that the steps down will be closed from the seat on the corner to the kissing gate on the eastern side of the bridge. This means that entry to the Wood can be made only from Crescent Wood Road, Grange Lane and Low Cross Wood Lane. The bridge reconstruction is scheduled to be completed in March. 

Project Notification Cox's Walk Footbridge Refurbishment.pdf

  • Like 1
  • Thanks 4
Link to comment
https://www.eastdulwichforum.co.uk/topic/339623-cox%E2%80%99s-walk-closure/
Share on other sites

  • 3 months later...

The last I heard was that an artificial wood is being used for the superstructure. I believe the bridge was rebuilt sometime in the 1980s so it’s evident that natural wood does not last very long in such a damp location. This alternative material is coming from Australia and has been delayed due to the Red Sea being closed and international shipping being diverted around the Cape. 

  • Like 1
1 hour ago, Brian up the hill said:

The last I heard was that an artificial wood is being used for the superstructure. I believe the bridge was rebuilt sometime in the 1980s so it’s evident that natural wood does not last very long in such a damp location. This alternative material is coming from Australia and has been delayed due to the Red Sea being closed and international shipping being diverted around the Cape. 

I think that artificial wood is often used now for bridges  in nature reserves etc

Obviously cheaper in the long term as it won't need replacing so often, and I think less slippery, so safer.

And it looks ok.

But I might be completely wrong 😀

  • Like 1
  • 2 weeks later...
On 02/05/2024 at 16:47, Brian up the hill said:

The last I heard was that an artificial wood is being used for the superstructure. I believe the bridge was rebuilt sometime in the 1980s so it’s evident that natural wood does not last very long in such a damp location. This alternative material is coming from Australia and has been delayed due to the Red Sea being closed and international shipping being diverted around the Cape. 

I was told the work had stopped because of the bird nesting season. 

  • 4 months later...
3 hours ago, Katherty said:

Is this still closed? Does anyone have news?

The entrance opposite the skate park was closed very recently when I passed it.

To the best of my knowledge the nesting season is over now, and I have no idea why it's all taking so long.

It's very annoying for those of us who used that entrance to go for a walk in the woods.

  • Like 1
  • Agree 1

I've been wondering the same thing. The works seem to have taken a very long time. Found this just now on the Southwark website:

https://www.southwark.gov.uk/transport-and-roads/highways-defects-and-improvement-maintenance/bridges-subways-and-walls?chapter=3

Quote

The completion of the works is the end of October 2024

As the project seeks completion, plants and materials will be moved extensively along the footpath from Dulwich Common to the footbridge. There have been recorded incidents of ‘trespassing’ on the construction site. In terms of health and safety, it is important that pedestrians walking in Sydenham Woods follow the signposts of the diversion route away from the construction site.

This footpath will remain temporarily closed until the site is completed and demobilised in October 2024. The bridge will be re-opened in November 2024.

... so sounds like another month at least.

  • Thanks 2
On 13/05/2024 at 08:38, Sue said:

It's a man made material which looks like wood, with the grain etc, but is more suitable for using on outdoor surfaces eg because it doesn't rot.

This is extremely sexist, Sue. Please. If we need it I can get real wood. It doesn't need to look like wood. And it'll be used on any outdoor surfaces as I wish. Etc. 

  • Haha 1

No chance, Sue. I'd much rather be rumbling with Jabba's wench in The Return of the Jedi. And I don't mean Princess Leia in her splendid bikini. I mean the tasty green alien lady with green tentacles coming out of her head. Yum. She can dance.

Edited by SpringTime
Everything
4 minutes ago, SpringTime said:

No chance, Sue. I'd much rather be rumbling with Jabba's wench in The Return of the Jedi. And I don't mean Princess Leia in her splendid bikini. I mean the tasty green alien lady with green tentacles coming out of her head. Yum. She can dance.

Are you drunk? 😀 

I like your reason for editing your post, btw. Though maybe you should have stuck to what was there before 😂

Edited by Sue
  • 2 weeks later...

Does anyone know when this work will be finished? According to the original Project Notification it was due to be finished on 5th March, but the entrance is still blocked by a gate. Really quite annoying for those of who live in the area and access the woods via that entrance

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • I think Watsons General Telegraph do two margaritas  for £13 every Thursday. The Great Exhibition also does a margarita deal on a Thursday: https://www.greatexhibition.pub/new-events-1 I've not tried either deal yet.  
    • We first used Aaron's services for a badly damaged wall that had gone back to the brickwork due to water ingress from the bay window. We found Aaron initially through recommendation and were very fortunate to do so as we already had a couple of quotes from trades found online that were just ridiculous, clearly just a rip off, so not sure what we would of done without that recommendation. We have just had more work completed by him, two walls skimmed and more comprehensive work where the brickwork was exposed around the fireplace. The wall above the fireplace was the original plaster finish and in good condition but the original plan was to have the whole wall replastered but we couldnt get the tv off the wall bracket so asked Aaron if he could just plaster up to the tv, not ideal but not much choice. Aaron didnt have any issue with that atall and more than happy to do it. Amazingly the join between the new plaster and old plaster is invisible. Perfect feather edge finish.  Aaron is very pleasant natured, he turns up on time, he doesnt mess about and gets on with the job. He works in a very clean manner. He doesnt try and inflate the job to make it more expensive. We found him to be extremely competitively priced. Both jobs have been finished to an excellent standard. The finish is so smooth its like glass. We will certainly be using his services again in the future.     Aaron Manser 07773 410661
    • Yes, and now there's a leak further down Barry Road. Two men from Thames came and stood there looking at it and then went away. Over 24 hours later water still pouring out and no sign of any action to repair
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...