I've just been told:


"

Update on gas leak.

Works continued over night at the above location but unfortunately due to position of the main additional excavations have taken place in Lordship Lane. For SGN to carryout repairs on the 30in main they have asked TFL to switch out the pedestrian lights on site this afternoon, Lordship Lane at the junction with East Dulwich Grove will then have temp 2 way lights in place with East Dulwich Grove remaining closed. I have been told these new restrictions should be in place by late this afternoon, where works will continue again through the night. I will update you all when more information becomes available.

Regards

Network Co-ordinator

"

Latest update is

"The repairs to the gas mains on Lordship Lane have been completed. The reinstatement will begin on Friday. COncrete will require a 5 day curing period before wearing course and road marking can be replaced. SGN expect to have the road open by end of the day on Frida 30th Aug."


Begs the questions why the concrete isnt poured today. And then finish on Wednesday two days earlier than currently Southwatk Council expect SGN to achieve. I've asked.

I did notice that where the hole was filled in, the road markings / hatchings have been done.


However the rest of the markings / hatchings now covered up with residue/ dust have not been done.


Why wasn't the whole area repainted.


The markings are now incomplete and confusing.


DulwhichFox

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • You'd need to get a proper quote (or three) for instance removing a cast iron bath is a very different job from removing an acrylic one. Again what pipe work will be being joined into - matching old imperial pipes with modern metric ones is different from like to like, as is dealing with a copper or an iron distribution system. The amount (area) of retiling required is an issue, as will be the state of the wall behind the tiles. It may of course all be very plain sailing, or not. Have a first look at plumber recommendations on the relevant pages on this site. If it's all easy then 3 days work may be sufficient. But it could be a week if there are snags. 
    • Hi. Can anyone suggest a plumber for the job below? Replace bath tub with a shower enclosure, putting pipes to showerhead behind wall, re-titling damaged/removed tiles Also any idea of the costs involved for the labour as we will buy the items required?
    • Aria came round to fix my tub drain when I'd messed up the seal. Came within hours, fixed the tub, and ran a bath to make sure it was okay. Here's where the fun starts. While he was over, I asked him questions about the rest of the plumbing round the house. I had just moved into a Victorian home that was previously being rented. Unsurprisingly, we found another leak in the tub and a drip in the kitchen tap.  He came back the next day to put a better pipe in my bathtub and replace the kitchen sink. Painstakingly figured out how to replace the hard-to-access kitchen sink without cutting through the wood panel with the help of his builder friend, Mark. Answered all my questions and clearly knew his stuff. All this right before Christmas holidays! 
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...