Jump to content

Recommended Posts

I have to disagree with you SteveUK1978.

In the planning application NetworkRail stated their design could only ever cope with 15mins train delays. WE've all experienced longer delays than 15 mins. When it happens the station will be unsafe so they will close it.

they've replaced total coverage of terminating platforms with partial coverage. Windy rain the passengers get wet.


This isn't the civic public building to represent a great London in the 21st century. It's mean spirited dross designed to create shopping malls rather than great public transport interchange that lifts the spirits.

James Barber Wrote:

-------------------------------------------------------

> I have to disagree with you SteveUK1978.

> In the planning application NetworkRail stated

> their design could only ever cope with 15mins

> train delays. WE've all experienced longer delays

> than 15 mins. When it happens the station will be

> unsafe so they will close it.

> they've replaced total coverage of terminating

> platforms with partial coverage. Windy rain the

> passengers get wet.

>

> This isn't the civic public building to represent

> a great London in the 21st century. It's mean

> spirited dross designed to create shopping malls

> rather than great public transport interchange

> that lifts the spirits.


Hyperbole.

> they've replaced total coverage of terminating

> platforms with partial coverage.


Not sure what you mean by "total coverage", but the platforms were definitely uncovered when you got further away from the station. And they were constantly flooded whenever there was a bit of rain.


I'm hoping the narrow platforms are a temporary measure, because a whole trainload of people slowly shuffling through that narrow space is clearly ridiculous - and unsafe.


Also reducing from 16 to 15 platforms... I'm unsure how this is progress?


The building itself... I think it's fine. It's not beautiful, but it feels light and spacious compared to the old station.

Here's a Huffington Post commentary that was widely quoted at the time. Both English Heritage and Terence Conran agreed that the design could have been more sympathetic:-


http://www.huffingtonpost.co.uk/rooksana-hossenally/britsh-heritage-versus-future-enterprise_b_1204776.html


In the end, the Planning Committee compromised by agreeing that our Planning Officers would work with Network Rail to salvage the poorly designed frontage by adding more glass and curves, which is the design you see promoted today although it's still not exactly considered to be very special. But Network Rail wouldn't agree to incorporate the heritage buildings, probably because it's just cheaper to knock the whole lot down.


The southern frontage, which backs onto the Shard, is much better... opening up the public realm to the Shard and Guy's Hospital is working really well.

I checked the running of the trains first thing this morning and they seemed fine. Arriving into LBG on the 8:10 from EDW (which was running to time) we hit a queue waiting to get into LBG.


The queue of people trying to get off at LBG, passing the few people waiting in the 'pen' will undoubtedly have taken longer than Southern have timetables the turnaround of the train, hence causing further delays.


I did notice that other services were also queuing to get into LBG at the same time, however, so it didn't seem to be restricted to our service. In the meantime, however, it also seemed apparent that platform 14 is not in use - has a further platform been taken away for the time being?

London Bridge has always been a ?troubled? station, with a complex history.


Originally built for the London & Greenwich Railway (the oldest in London) it opened in December 1836. By 1842 the South Eastern Railway (SER) also terminated in London Bridge, as did the Croydon Company and then the London, Brighton and South Coast Railways Company (which latter two subsequently merged as the LB&SCR in 1846).


By the late 1850s the two companies operating into London Bridge were the SER and the LB&SCR ? running virtually separate stations on the site ? with a wall separating their two sets of platforms (the SER was to the north). Two platforms in 1836 became 21 at the station?s heyday (how have the mighty fallen!).


By as early as 1854 10 million passenger a year were using the station. (Source:- ?Bankside? by David Brandon and Alan Brooke)


Tne troubles in 2014 are just part of its rich history.

the original London Bridge itself


It was the 19th century replacement London Bridge (not the medieval second or third bridge - often though of as the original because it had the longest history - which had houses, shops a chapel (and a mini stately home) on it) - and most evidence suggests he did know what he was buying.

He also bought Peckham thinking he was getting Durham.


StraferJack Wrote:

-------------------------------------------------------

> is that the same as the yank who was sold the

> original London Bridge itself, thinking it was

> Tower Bridge?

StraferJack Wrote:

-------------------------------------------------------

> ( should be noted that the buyer denied he got the

> wrong bridge... But c'mon)


Indeed - and many tourists still call Tower Bridge "London Bridge" in my experience. Check "London Bridge" on Google images - 10 of the first 16 photos are of Tower Bridge.

I used to take the train from ED to london bridge for work for about a year and to be honest, a lot of people travelling that way do move like cattle and should be treated as such. I'm obviously exagerating but I think the whole thing with congestion would be easier if people moved with a bit more pep in their step.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • Nasty piece of work. Targets locations with a healthy independent presence and farmers’ markets; typical vampire capitalism. Great supporter of a Brexit too. All good reasons to go elsewhere, preferably small independent., 
    • Hi, oglander , Congratulations on your soon-to-arrive little lion - how exciting! It's always lovely to hear someone taking the adoption route (shelters are having a major crisis at the moment!). I've been in business for 15 years & can say with certainty that most cat owners in Dulwich have catflaps so, not only are they easy to have installed, but you shouldn't find yourself short of helping hands on these local forums. A catflap is a brilliant way to keep your little lion safely in overnight as well as generally keeping track of their comings & goings. I'd be happy to walk you through the set up once you've chosen your model (SureFlap & PetSafe are two popular brands). I'm sure the rescue has already advised, but just in case they haven't, it'll be very important to keep your newly adopted cat housebound for the first 2 weeks to familiarise themselves with their new home. Once they've scent-mapped the house, you can gradually begin letting them out to explore & scent-map the garden. Exciting times! x
    • Hello all,  If your child goes to this gym club: since the new payment system, have you received clear information about the cost per session, the cost per term and when sessions will be omitted eg for school opened days? (I have asked the club, more than once, no full response so far) This term started in late August, before school had gone back (did many attend that session?). Next term there is no break for half term, so there are 12 sessions to be paid. Does that seem to be more sessions than there used to be?    I am sure they are doing their best, but the info from the new auto pay system isn’t detailed enough, and the auto pay just takes an unspecified amount. I wondered if it’s just me (wanting more detail), or if there are others too? (my child loves the gym itself!) thanks 
    • ⭐️⭐️⭐️⭐️⭐️ Excellent service! We had one of Paul Edgley’ s team come to fit some new lights in our living room. They were able to come at reasonably short notice, arrived on time, were friendly and professional, and did a great job. Everything was left clean and tidy afterwards, and the lights look fantastic. Highly recommend! Paul’s contact details are 07802 627967  
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...