JimH Wrote:

-------------------------------------------------------

> What the hell is wrong with the signals and what

> the hell is congestion at London Bridge?



From what I can tell as a layperson, they've changed some of the track layout, so that some of the tracks that used to be used for outbound are now for inbound, and the other way around too. Previously you'd see a single track gap between inbound trains from South Bermondsey and the others (where the outbound train from London Bridge ran to South Bermondsey), whereas now they run side-by-side.


This affects where the trains crossover tracks, nearer to the station, and for whatever reason they haven't sussed the sequencing to allow them to do it safely, which creates time delays all round.

but see that is part of the problem. I am sure it is not easy moving signals, platforms and sequencing around but surely they have some sort of plan as to how it work going forward. It almost sounds that they move things around and then decide to figure out how it will work once it is actually up and running.

I've just received the following email/statement about all this. it makes one wonder whether moving from 6 through and 9 terminating platforms to 9 through and 6 terminating platforms will result in long-term train service reductions for SE london train stations. I suspect we'll need to campaign for osme of thel ocal services to go through LB to Charing Cross to ensure they survive all the changes. Anyway, the statement:


"

Network Rail & Southern statement on London Bridge train station


Network Rail and Southern apologise for the unacceptable disruption and delays to passengers at London Bridge this week resulting in severe overcrowding on the concourse. This is not the level of service that customers deserve, expect or that we want to deliver.


Over the festive break we undertook 16 days of work rebuilding two new platforms, removing and replacing 3km of track and installing new signalling into London Bridge. This work was completed on time.


However, the new timetable has proved challenging to manage. We have reviewed this and made some immediate changes to a small number of evening peak services which will reduce the pressure on the infrastructure and allow us to deliver a more punctual service that passengers deserve.


We will monitor the service this week and assess if any longer term changes are required.


We have reviewed the operation of the station concourse, placed more staff at London Bridge, and implemented additional crowd control measures to separate passengers entering and exiting trains. By the end of the week, we will have additional passenger information screens, so the concourse is used more evenly.


Passengers are asked to check with their train operator before they travel.


Notes:

To improve services for the majority of passengers using trains from London Bridge, the five services from London Bridge to West Croydon have been removed from the evening peak. They were stopping trains that departed at 16.36, 17.06, 17.36, 18.06 and 18.36 and called at New Cross Gate, Brockley, Honor Oak Park, Forest Hill, Sydenham, Penge West, Anerly and Norwood Junction.

"

"However, none of these routes offer quite the speed and frequency of the old London Bridge service"


True, but the options are there, albeit less appealing than a fully working LB line.

The ED -> LB is buggered, for some time yet. So it's time to consider alternatives - they clearly are alternatives precisely because they do NOT deliver a carbon copy service.

How are they allowed to just remove five trains that all go to the same places. This will force a large number of people onto the few trains that operate in a peak 2 hour period. Why not spread the removal of trains across all journeys.


I am so glad I didn't waste money buying a season ticket for this farce of a service.

woodland Wrote:

-------------------------------------------------------

> How are they allowed to just remove five trains

> that all go to the same places. This will force a

> large number of people onto the few trains that

> operate in a peak 2 hour period. Why not spread

> the removal of trains across all journeys.

>

> I am so glad I didn't waste money buying a season

> ticket for this farce of a service.


My similar query is why run one of the peak trains to South Bermondsey and not to LB in the morning. No offence to anyone from South Bermondsey but who the hell travels there at that that in the morning if at all (unless there are any Millwall supporters out there).

Legged it for the 22.40 train last night... Got on.. And went nowhere fast. 15 minute delay to a train on the platform and ready to go!!


Tweeted Southern and they blamed it on 'congestion after the works' and 'signal failures'. Utterly ridiculous.

Oddly given the horrendous weather this morning (surely an excuse in waiting) the commute was quite good on the 8.10am. Only sat at South B for 3 mins or so. I guess it can work where everything runs to plan. The problem seems to be as soon as there is a small issue anywhere in the LBG areas there is no margin for error and the whole timetable falls apart.

Something to look forward to next week as well. I think the through services to Charing Cross stop from next week so those people trying to get to the West End are likely to get on the Jubilee Line instead. From an email from TFL today....



Some Tube and London Overground stations including London Bridge Tube station may be exceptionally busy, especially during peak hours. Jubilee line stations between London Bridge and Waterloo and London Overground stations between Sydenham and Canada Water will also be busier than usual. This is while National Rail customers take alternative routes

Correct KK - from next week no LB to CX trains until August.


From TFL:

"Between 12 January 2015 and August 2016 Southern (and any permitted route) passengers who currently interchange onto Southeastern services at London Bridge for travel to Charing Cross or Waterloo East will be unable to do so due to changes to the operation of Southeastern services"

One of the most frustrating if not most important things is the so called 'crowd control measures'. The misery starts outside the main entrance to the station when hundreds of commuters are shunted into a sort of corral to shuffle forward slowly into the station. Then once you are in the station there are so many people you are lucky if you can get near the announcement boards to even see what trains are cancelled or might be turning up. Then the crowd control keeping everybody back from the platform fast becoming a larger than safe number of frustrated commuters waiting for the passengers to get off the train that finally arrives and get squeezed past in another narrow walkway. These measures add to the misery, lack of safety and sense that the whole station does not seem to be fit for purpose.

A lady from Gipsy Hill has started a petition demanding that the fare increase be delayed until they get these services back to some semblance of normal running:

https://www.change.org/p/sign-this-petition-about-the-shambolic-londonbridgetrains

SteveUK1978 Wrote:

-------------------------------------------------------

> The problem seems to be as soon as there is a small issue anywhere in the

> LBG areas there is no margin for error and the whole timetable falls apart.


I think that's exactly it... the schedule is so tight, there's no room for contingency. So as soon as one train is delayed by 2 mins, trains start backing up and there's insufficient capacity to clear the backlog. I recently heard an honest driver announcing "sorry for the delay, but the reality is that there are just too many trains on too little track".


The loss of LB to Charing X is a further nail in the coffin, but TBH won't make much difference to me as I've basically given up on using LB.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • There's quite a difference between going for a run around the footpaths and trying to sit quietly for an afternoon in a wide, grassy area and enjoying the peace & nature. The other two grassy areas in the park are used for sports, and both had barriered trackway running through them. The Parkrun had to be cancelled for at least three weeks, iirc. I'm concerned by your continued reference to "the rye" - the event is held in the park, not on the rye (common). There is a big difference, despite the organisers and council artificially amalgamating the whole area when trying to convince everyone that it's only a small area that is closed off. The railings & gates enclosing the park are a big clue...
    • So have you cancelled your contract with InPost / Yodel now? If so, that's probably caused hundreds of parcels to be stuck in limbo, as they've said to me before that they can't redirect them to a different store. I have a parcel that was refused by you twice, the last time on 5/12, and since then there's been no updates, despite me calling them 3 times. They just say it's being investigated, but if they now can't physically deliver to you then that is obviously the issue. So much for shopping for Christmas presents early, looks like I'll never get them now.
    • I thought I noticed the shop being redecorated the other day when I passed. Also the old Romeo Jones had some works going on, I think 
    • Leon came to sort out a lighting issue for us last week.  He quickly diagnosed the problem and gave clear, detailed advice about how to avoid in future.  Would highly recommend him.