Jump to content

Recommended Posts

I am not aware of MG as an accident hotspot at all. It does seem an utter waste of resources.


To what extent is the path to be widened? By hook or by crook the aim is to close this road off to traffic and the latest excuse is that peopel with buggies cannot get by. I cannot help but note Councillor Barber's comment that any path widening is to aid people walking with buggies. There is no mention of the elderly or disabled. For me this indicates whose interests are paramount for our local rep. Survival of the fittest and loudest.

Widening the pavements around the trees on Melbourne Grove will also mean losing a few parking spaces, putting pressure on parking and possibly leading to calls for a CPZ, something I know Southwark are loathe to implement.
There are two trees that cause difficulty for buggies, wheelchairs, people pulling suitcases to the station etc. They are both on the same side of the road. It's really not that hard to cross the road if getting past is a problem for you.

Hi Abe-froeman,

Yes generally - but still a significant number speed.

The alternative to kerb buildouts was copping these mature trees down. We wanted to avoid this.

This stretch of road is the busiest section or road in SE22 without traffic effective traffic calming. Residents in lots of other roads have had this with less speeding and less volume of traffic.


Hi d.b.,

TO make such a crossing we'd need to put extra dropped kerbs. We'd need to ensure people didn't park in front of such dropped kerbs with double yellow lines. Same amount of parking would be lost and we'd inconvenience people walking along the road.


Hi first mate,

You've watched too many dodgy movies. No councillor is talking about closing this road. This idea was floated early on but we've all listened to resident feedback and it is not on the agenda.

I and 5 other councillors agreed we needed to respond to residents requests as we have for all other such roads in the area - and agreed to upgrade the poor out of date traffic calming. Not sure why we should penalise these residents for being on the last section of such road.


The next step is to find a way to clam the northern section of Melbourne Grove.

The northern section already is calm, thanks to parking both sides which does not allow two lanes of traffic to flow. Hence queues building up in EDG. It's hard to think that only recently this was a bus route with no complaints. Please don't spend any money on it.

Indeed Reg.

First priority is to ensure the new schools entrance is on East Dulwich gRove OR only temporarily via Jarvis Road/Melbourne Grove until the school building is complete.

Then we need to sort out Melbourne Grove 9north) rush hour congestion.

BrandNewGuy Wrote:

-------------------------------------------------------

> Indeed. Just shows what noisy people can get.

> Ridiculous.


Tt may not have been clear, but this was my point (not that Melbourne Grove was a hotspot, quite the opposite). My hope is that in future, there will be a more strategic approach to prioritising road changes, which will target hotspots, rather than simply responding to 'he who shouts loudest'.

James Barber Wrote:

-------------------------------------------------------

>

>

> Hi first mate,

> You've watched too many dodgy movies. No

> councillor is talking about closing this road.

> This idea was floated early on but we've all

> listened to resident feedback and it is not on the

> agenda.

> I and 5 other councillors agreed we needed to

> respond to residents requests as we have for all

> other such roads in the area - and agreed to

> upgrade the poor out of date traffic calming. Not

> sure why we should penalise these residents for

> being on the last section of such road.

>

> The next step is to find a way to clam the

> northern section of Melbourne Grove.


James, I'm slightly concerned that you would even pretend to know anything about my viewing habits...... Also, I don't know of any movies, dodgy or otherwise, that star a local councillor intent on closing a residential street.

James Barber Wrote:

-------------------------------------------------------

> Then we need to sort out Melbourne Grove 9north)

> rush hour congestion.


Wait a minute, one minute you want to calm it, now you want to 'sort out' the congestion? Which one is it? This is a recipe for spending money on every road that doesn't have some notional ideal speed. Madness. Let's not spend the shrinking council cashpile on stuff that doesn't need doing.

  • 4 months later...

So, it turns out these speed humps probably won't reduce the top speed of vehicles as they accelerate in between them but they will generate a lot more pollution in Melbourne Grove and it seems that such pollution causes a significant number of deaths.

Oh dear.


http://www.telegraph.co.uk/news/2016/12/01/speed-bumps-could-removed-cut-traffic-pollution-save-lives/


"The Imperial study found that in one north London street with a speed limit of 20mph and fitted with road humps, a petrol driven car produced 64 per cent more Nitrogen Dioxide (NO2) than in a similar 20mph street fitted with road cushions. It also produced 47 per cent more Particulate Matter (PM) and nearly 60 per cent more Carbon Monoxide (CO2) emissions."

They recommend average speed camera enforcement.

If that was a real option allowed by government regulations and the London Camera Partnership I'm sure those would be suggested instead.

Looking at the NICE evidence included as part of the NICE consultation no allowance for variations in legal frameworks appears to have been considered or crash stats impact.

The contrast was even more pronounced when it came to a car using diesel.

"This produced 98 per cent more NO2 when driven over humps rather than cushions, along with 64 per cent more CO2 and 47 per cent more PM.".

  • 3 years later...

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • There was another unprovoked attack on Monday this week on a young woman nearby (Anstey Road) at 6.45pm. Don't have any other details, it was posted on a Facebook group by her flatmate. Pretty worrying  https://www.facebook.com/share/p/1EGfDrCAST/
    • OMFG is it possible for the council to do anything without a bunch of armchair experts moaning about it? The library refurb is great news, as it's lovely but completely shagged out - the toilets don't even work reliably. Other libraries in the area will be open longer house during the closure. July is a rubbish time to begin a refurb because it's just before the entire construction sector goes on summer holiday, and it would mean delaying the work another 8 months.
    • Licensing application for 2026 has gone in and they want to extend the event from 4 to 7 days accross two weekends.  There are some proposed significant changes to be aware of:   Event proposal moves to two separate weekends Number of days of the festival moves from 4 to 7 meaning also a change in the original licence is required Expected footfall in the park over the two weekends around 60,000.    Dear Peckham Rye Park Stakeholder,   Re: STAKEHOLDER CONSULTATION – event application: ‘GALA and On The Rye Festival 2026’ – ref: SWKEVE000935   We are writing to you because you have previously identified yourself as someone who wishes to be informed about event applications for Peckham Rye Park, or we think that you might have an interest in knowing about this particular event application.   Please be aware that the council are in receipt of an event application for: GALA and On The Rye Festival 2026’   In line with the council’s Outdoor Events Policy and events application process we are carrying out consultation regarding this application.   The following reference documents are attached to this email:   Consultation information APPENDIX A – site plan weekend 1 APPENDIX B – site plan weekend 2 APPENDIX C – Production Schedule APPENDIX D – 2025 Noise Management Plan   The consultation is open from Tuesday 4 November and will close at midnight on Tuesday 2 December 2025   Community engagement sessions will take place on Wednesday 19 November.   If you would like to comment on application: SWKEVE000935 and take part in the online consultation, please visit:   www.southwark.gov.uk/GALA2026   If you have any questions, please don’t hesitate to contact us.     Kind Regards, Southwark Events Team Environment and Leisure PO Box 64529 London SE1P 5LX 020 7525 3639 @SouthwarkEvents APPENDIX A - SITE PLAN weekend 1.pdf APPENDIX B - SITE PLAN weekend 2.pdf APPENDIX C - PRODUCTION SCHEDULE.pdf And just to add that councillor Renata Hamvas chairs the licensing committee. Worth contacting her with views on ammendments to the original license. I am fairly sure she won't grant any amendments, but just in case.....
    • Second time Aria has completed a plumbing job for me and both times he’s been polite. Communicative, kept to time and completed the job. He’s very helpful and tidy as well. First job was ball valve in water tank, not easy at all. He and his team were fantastic. This time kitchen tap cylinders replaced and tap tightened.  Much appreciated, Aria thank you.
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...