beaver14uk Wrote:

-------------------------------------------------------

> Well there were certainly workman there on Friday

> as I was in the area. At the end of the day its

> an emergency gas leak so sadly you have to put up

> with the disruption.


If it was an 'emergency', they'd have fixed it by now.

With sub zero temperatures I don't believe concrete sets. Every at just above zero temperatures concrete setting must be slow. This must be severely limiting the speed of reinstatement and cause much of the delays - unless a road works conrete setting expert on the Forum can advise otherwise?
Yep you are correct, concrete should not be poured as ice crystals will form, also, the asphalt surface course can not be laid at these temperatures, also the plastic gas pipes are heat welded together which would be very difficult in this wet and cold weather

They are temporary signals you cannot phase them like the permanent signals owing to limitations in the equipment and lack of signage on the temporary signals to display banned turns and exceptions.


Temporary signals also lack any features like the fixed signals to vary their timings dependant on demand, which is making the problem worse.

skidmarks - that's not true! They can of course be phased more efficiently. Admittedly now, North and South traffic flow will not be able to move at the same time now (since only one lane is available now), although I don't understand why East and West cannot (as was allowed with the permanent set).


Temporary lights can come with sensors to allow for dynamic phasing - they just haven't bothered.

Ok you obviously know more than me as it has been a number of years since I played with temporary signals. This is how I remember the phase controller for portable signals looking for 4-way control (Picture). I cannot see how you link two phases to be green at the same time without the conflict light coming on.
I noticed they recently put up a little sign on the West part of East Dulwich Road informing us that it's not a pedestrian crossing. You wouldn't have thought it would be all that hard to make it safe and suitable for pedestrians.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • It worked. Corbyn did similar although not to the same degree. Momentum had a purge too when Corbyn got in. All his political life he opposed the EU but when it came to the crunch he publicly backed them during the referendum. I believe that was to appease the middle classes that he was appealing to. He messed up big time when wooing the middle classes at Glastonbury whilst ignoring his core working class voters up north. They also happened to be leave voters. He got starstruck and forgot about his politics. Corbynmania was thing, a movement but it was also the making of his downfall. For the many and not the few came back and slapped him right in the face. 
    • Nothing to do with the tories overspending whatsoever eh! Blame the last 10/11 years of blatant mismanagement, incompetence and willful deceit on the poor bastards that were left with the fall out of a complete car crash tory government.   One PM after another falling on their sword. Open corruption and piss taking throughout covid and a legacy of huge debt and destruction yet in your view it will be labour's 4 years in power that bankrupts us in 2029.  Another one that must think people are blind and stupid.  Rejoice rejoice. It's a pity he and his fellow clowns were completely annihilated at the ballot box. I mean they were doing so well after all 🙃🙃
    • Where did I say he did a good job? Yup and Corbyn was very close to Len McCluskey and funded by Unite wasn't he...they're all as bad as each other... Labour have to purge their party of the far-left - they're a disaster. Allan Johnson summed it up so well on election night in 2019....  
    • Thank you for the detailed advise @trinidad It is definitely damage we are concerned about. I don’t think Evri would agree to pay the bill to fix our gate or letter box if they were to be damaged as a result of their delivery drivers helper. Our doorbell can be heard from outside when rung so we don’t quite believe the aggressive simultaneous door/letter box banging is necessary. It can be quite a shock it is done very aggressively.  I’ll definitely action the steps you’ve kindly provided along with a phone call tomorrow. I do sympathise with the role drivers have and how busy they are, which is why we tried communicating directly with her but sadly we haven’t succeeded 
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...