beaver14uk Wrote:

-------------------------------------------------------

> Well there were certainly workman there on Friday

> as I was in the area. At the end of the day its

> an emergency gas leak so sadly you have to put up

> with the disruption.


If it was an 'emergency', they'd have fixed it by now.

Link to comment
Share on other sites

With sub zero temperatures I don't believe concrete sets. Every at just above zero temperatures concrete setting must be slow. This must be severely limiting the speed of reinstatement and cause much of the delays - unless a road works conrete setting expert on the Forum can advise otherwise?
Link to comment
Share on other sites

Yep you are correct, concrete should not be poured as ice crystals will form, also, the asphalt surface course can not be laid at these temperatures, also the plastic gas pipes are heat welded together which would be very difficult in this wet and cold weather
Link to comment
Share on other sites

They are temporary signals you cannot phase them like the permanent signals owing to limitations in the equipment and lack of signage on the temporary signals to display banned turns and exceptions.


Temporary signals also lack any features like the fixed signals to vary their timings dependant on demand, which is making the problem worse.

Link to comment
Share on other sites

skidmarks - that's not true! They can of course be phased more efficiently. Admittedly now, North and South traffic flow will not be able to move at the same time now (since only one lane is available now), although I don't understand why East and West cannot (as was allowed with the permanent set).


Temporary lights can come with sensors to allow for dynamic phasing - they just haven't bothered.

Link to comment
Share on other sites

Ok you obviously know more than me as it has been a number of years since I played with temporary signals. This is how I remember the phase controller for portable signals looking for 4-way control (Picture). I cannot see how you link two phases to be green at the same time without the conflict light coming on.
Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • I certainly hope she’s not standing down. She’s a great MP both locally and nationally. 
    • I had certainly heard that Helen Hayes was planning to stand down from being an MP - although I don't think I've seen that confirmed anywhere that I recall. If so, that is a shame, she was generally very competent and she knew the area well. A very good constituency MP and  had performed reasonably creditably in a minor Front Bench role. A loss to Parliamentary politics, in my view, if she is standing down.
    • We've just bought a previously tenanted flat which has come with a large amount of cutlery and cooking utensils which we'd be happy to give away. 
    • Sadly this means for those of us who live within this ward the brilliant Helen Hayes will no longer represent us (that is if she's standing again). The Labour candidate for Lewisham West and East Dulwich is Ellie Reeves who has been MP for West Lewisham and Penge before the redrawing of boundaries.  She is sister to Rachel Reeves.
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...