Jump to content

Recommended Posts

look, the point is, f u c k the present cpt management for getting rid of a good thing. the others have put it much better than I ever will, but in a c r a p room. I have no issues with anyone (hugs, really?).


Whats admin goin to do, muver feckin admin = f u c k sigs

Rather than everyone cry Admin I'd rather get two sentences from CC that made sense even if it were tomorrow. I don't understand half of what you are trying to say CC so I challange you to do it in a way most people will understand. If not don't expect any support for what appears to be simply abuse.

really, it's a bit late to concentrate.


there's a crap quiz at the pub. I mean, it really is, but Martin and Lesley put a feck load of effort into it, and to be hoenset, it is not going to better by getting somebody else in (despite my protests, it is many ways, the best quiz in the area coz it's a proper challenge), the pub are feckin up by getting rid of it.

More than happy, and whilst I may think its crap (coz its hard) may don't. started the thread because I'm angry, sure others can make a better argument, and I'll be more than happy to let them. not speaking on behalf of martin or lesley, just me. and i'm pissed off by it. more than happy to be responsible for what i've said, does anybody really have problem?

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • You'd need to get a proper quote (or three) for instance removing a cast iron bath is a very different job from removing an acrylic one. Again what pipe work will be being joined into - matching old imperial pipes with modern metric ones is different from like to like, as is dealing with a copper or an iron distribution system. The amount (area) of retiling required is an issue, as will be the state of the wall behind the tiles. It may of course all be very plain sailing, or not. Have a first look at plumber recommendations on the relevant pages on this site. If it's all easy then 3 days work may be sufficient. But it could be a week if there are snags. 
    • Hi. Can anyone suggest a plumber for the job below? Replace bath tub with a shower enclosure, putting pipes to showerhead behind wall, re-titling damaged/removed tiles Also any idea of the costs involved for the labour as we will buy the items required?
    • Aria came round to fix my tub drain when I'd messed up the seal. Came within hours, fixed the tub, and ran a bath to make sure it was okay. Here's where the fun starts. While he was over, I asked him questions about the rest of the plumbing round the house. I had just moved into a Victorian home that was previously being rented. Unsurprisingly, we found another leak in the tub and a drip in the kitchen tap.  He came back the next day to put a better pipe in my bathtub and replace the kitchen sink. Painstakingly figured out how to replace the hard-to-access kitchen sink without cutting through the wood panel with the help of his builder friend, Mark. Answered all my questions and clearly knew his stuff. All this right before Christmas holidays! 
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...