More Roadworks In Rye Lane


trentk69

Recommended Posts

As I walked from the bus stop that the number 12 and 197 have been diverted to, up onto Rye Lane and to Peckham Rye train station this morning, I noticed that the workers seem to be digging up the same piece of road that they had worked on and sealed up a week or so ago...


Did they forget something?


Are they on track to finish this work by the end of November as previously stated, or perhaps they are ahead of schedule and need to drag the work out until then?


When will these disruptions end, and what is next?

Link to comment
Share on other sites

DJKillaQueen Wrote:

-------------------------------------------------------

> What is next is resurfacing of the entirety of Rye

> Lane....much needed I think all will agree.



Is this definitely happening?

As a cyclist who use Rye Lane almost every working day, this is great news.

Link to comment
Share on other sites

HonaloochieB Wrote:

-------------------------------------------------------

> Keep to the diversion I say it's quicker most

> mornings.


I have to say, I think the current diversion where buses only go one way down Rye Lane is a massive improvement. Bit more of a walk to PR station, and getting a double decker bus under the bridge on Consort Road needs to be done carefully, but traffic is just so much more freeflowing...

Link to comment
Share on other sites

I might run the risk to say something very unpopular but I find the disruption in Rye Lane a massive hassle and I look forward for the roadworks to be over! as someone who doesn't own a car I think that priority should be given to public transports (and authorized delivery van for the shops) and the rest of the traffic should permanently be diverted.

it's getting darker and colder and whilst car drivers can at least comfortably seat in the warmth of their car, we public transport passengers have to walk half a mile or more to catch a bus from the train station!

Link to comment
Share on other sites

Yes the Lane is definitely going to be resurfaced in entirety once the water and other works are finished.


There are constant discussions about what can be done to improve the traffic/ pedestrian flow in Rye Lane. There are no easy solutions and it may be while before any ideas on the table form any kind of formal proposal seeking funding. But it is at least on the radar of discussion amongst the planning and transport powers that be.

Link to comment
Share on other sites

JohnL Wrote:

-------------------------------------------------------

> Make permanent delivery areas - knocking down one

> or two shops - and free up a square around the

> station


The square has been pushed by the Peckham Society / Peckham Vision bunch a few times, there are some complex land/building ownership issues with Network Rail I think.

Link to comment
Share on other sites

Thames Water finishing their works and a complete resurface by the end of November? Really? What else? There more chance of that mythical Waitrose/M&S Foodhall popping up in place of the old Woolworths if you ask me. As I understand it, there is now legislation in place "the Streetworks Act" which charges companies who (not unreasonably now and then) have to dig up the carriageway to maintain their assets, and charges them even more if they over run...I wonder if we'll see any of the revenue from those charges put into the development of Rye lane...
Link to comment
Share on other sites

Why don't you ask Simon Philips at at the panning department yourself? Resurfacing of Rye Lane has always been the final part of the works to both the North and South end of the Lane. That's why people like I bother to engage with the local council, councillors, attend meetings and so on.....so that cynical idiots like you can dismiss the information from those of us that actually know what's going on of course.
Link to comment
Share on other sites

@ DJKilla Queen - I've no problem with being called a cynic, but I do take exception to the "idiot" label. If you have the time and inclination to contact the council, not least with the positive belief to take what they say as fact, then all power to you. The world needs more people like you.


If, however, you get time between corresponding with the council and riding your high horse down Rye Lane, you might want to reign your neck in a little at your pithy name calling to a comment which is born simply from freezing my backside off and getting occasionally soaked while walking the half mile to and from station to bus stop twice a day every day for the last few months.

Link to comment
Share on other sites

neilson99, I completely agree with you. DJKQ is absolutley out of line, and perhaps a little drunk on the fumes of power that must exude from all the council meetings. To call the humble commuter (you, me, et al) who is frustrated by what seems to be yet more excuses, delays and diversions from this work, a "cynical idiot" is a little rich.


Perhaps I should make time to attend these council meetings, but unfortunately in the real world, I have to hold down a job, pay my mortgage and try to carry on as best I can, so any spare time to me is very precious... hence, to my detriment, I do take the information I am given at face value. This photo was taken yesterday - already a week over due, and they are still digging deeper.

Link to comment
Share on other sites

Whatever guys.....I manage to work AND find out things rather than ranting and whining in a forum because there are a few road works happening for a few months and having to walk a little. And neilson my reaction to your post was the ignorant sarcasm with which you wrote.


The improvements to Rye Lane have taken two years to plan and take time to execute. They've cost a lot of money and are badly needed. Not everyone is happy with the things like the cycle contra flow etc but being involved is better than leaving planners to their own devices. They WILL be finished in the not too distant future.

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • Something doesn't quite smell right here and probably it's not  the chicken. Both the OP and TheWeekEnd specifically mention  chicken thigh fillets. TWE purchased £14 worth of chicken thigh fillets and they were thrown away "probably for the third time". £14 equates to around 12 fillets which is a lot. Could some have been frozen after purchase and then thawed? And thawed properly before cooking? TWE has a total of 4 posts of which 3 are on this thread.  
    • Thanks to all for the advice, very glad to have this community for these enquiries. Here is how it got resolved in case its useful for anyone in the future: I had ordered some garden waste bags, and when the Veolia person came around I just asked them, and they were more than happy to take it no questions asked. 🙂 
    • I keep seeing a thread 'missing cat', but you've been found.  Not sure if all would consider that a good thing.  Not a lot new happening ....  When you back in Blighty?
    • In March Oli and his team did an excellent job of the following work at a property I manage.  1. Completely removing existing broken front path. Covering and securing the void (coal shute) beneath using concrete lintels, waterproof membrane and concrete. Laying a compacted sub-base and new clay pavers. 2. Removing broken fence. Securely installing 6 fence posts and 5 fence panels across the end of the back garden. Base of posts wrapped in plastic  sheath and set in post mix. 3. Removing broken render from terrace steps and cleaning then re-rendering steps where needed and repairing other parts.  4. Jet washing rear patio. I would like to thoroughly recommend him to you for a job done very well at a fair price.  
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...