Jump to content

Recommended Posts

There is at least one of the (likely very) many No 12 new Routemasters that have had windows retrofitted on both decks but only on the pavement-facing side. They slide open on the inside so keep the flush look of the original design.

Cue complaints of "it's too draughty" as soon as mid-August is out....

Link to comment
https://www.eastdulwichforum.co.uk/topic/117145-se22-buses-get-a-revamp/
Share on other sites

Now, if they'd just put in some comfy seats with a bit of leg room, get rid of one of the staircases and back doors, redesign downstairs to make more room and work on the suspension (like the previous perfectly comfortable, spacious and well designed incarnation), we'll have decent buses again.

Amen to that! The a/c is appalling, it just blasts warm air. These are the most uncomfortable buses I've ever been on.


craigyboy71 Wrote:

-------------------------------------------------------

> Finally!!!! Although this came too late for our

> week's Summer. The cooling system on these new

> buses is appalling, so it really needed doing.

rahrahrah Wrote:

-------------------------------------------------------

> Jeez, the amount of money wasted in yet another

> Boris vanity project....


This precisely.


If memory serves, these new buses cost approx ?100k more to build per bus than the older, better ones.

The smell on these buses is awful, I'm guessing that was due to no windows / flow of air? Rancid.


And sod the windows on the 12 - when are we going to get replacements for the 176? I know of no other local route that runs buses that are 13 years old. We'll have bus-spotters riding them soon for their vintage value.

jim_the_chin Wrote:

-------------------------------------------------------


> And sod the windows on the 12 - when are we going

> to get replacements for the 176? I know of no

> other local route that runs buses that are 13

> years old. We'll have bus-spotters riding them

> soon for their vintage value.


The 176 got a two year extension last year to run the old buses until 2017.

The N176s (or perhaps it is without the "N" because it is a 24-hr service) at night are much more modern and quieter (not that they could be any louder) but I think they are run at night because of their better CCTV. It is a shame because the 176s are old workhorses that should be put out to pasture sooner rather than later.

Do you remember the ones with the slatted, wooden floors and ingrained grime? It was like TfL meets Peaky Blinders.

Nigello Wrote:

-------------------------------------------------------

> The N176s (or perhaps it is without the "N"

> because it is a 24-hr service) at night are much

> more modern and quieter (not that they could be

> any louder) but I think they are run at night

> because of their better CCTV. It is a shame

> because the 176s are old workhorses that should be

> put out to pasture sooner rather than later.

> Do you remember the ones with the slatted, wooden

> floors and ingrained grime? It was like TfL meets

> Peaky Blinders.


The 176 at night uses spare buses from the 133 route which also operates out of Norwood Bus Garage.


Buses used during the day have been converted to meet emissions standards, but still sound like Concorde.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • You'd need to get a proper quote (or three) for instance removing a cast iron bath is a very different job from removing an acrylic one. Again what pipe work will be being joined into - matching old imperial pipes with modern metric ones is different from like to like, as is dealing with a copper or an iron distribution system. The amount (area) of retiling required is an issue, as will be the state of the wall behind the tiles. It may of course all be very plain sailing, or not. Have a first look at plumber recommendations on the relevant pages on this site. If it's all easy then 3 days work may be sufficient. But it could be a week if there are snags. 
    • Hi. Can anyone suggest a plumber for the job below? Replace bath tub with a shower enclosure, putting pipes to showerhead behind wall, re-titling damaged/removed tiles Also any idea of the costs involved for the labour as we will buy the items required?
    • Aria came round to fix my tub drain when I'd messed up the seal. Came within hours, fixed the tub, and ran a bath to make sure it was okay. Here's where the fun starts. While he was over, I asked him questions about the rest of the plumbing round the house. I had just moved into a Victorian home that was previously being rented. Unsurprisingly, we found another leak in the tub and a drip in the kitchen tap.  He came back the next day to put a better pipe in my bathtub and replace the kitchen sink. Painstakingly figured out how to replace the hard-to-access kitchen sink without cutting through the wood panel with the help of his builder friend, Mark. Answered all my questions and clearly knew his stuff. All this right before Christmas holidays! 
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...