Jump to content

Recommended Posts

The spur track south of Peckham (visible on trains from ED station going into London Bridge) seems to be well on the way to completion. I wonder if the work at Denmark Hill would stop the line itself being completed?


The Overground line could start running and just not stop at Denmark Hill until work there is complete. We could start to see ghost Overground trains using the new route to bed in.


It would also not surpise me if an early limited service was started in time for the Olympics - a nice bit of PR for the Overground and for Boris.

TfL have told us (SRUG, Southwark Rail Users' Group) that the plan is to end the South London Line on 8th December and start the East London Line on the 9th December 2012. Indications are that all is on time.


From that point we will have the extra 4tph between Clapham Junction and Canada Water (Jubilee connection), but lose 2tph to London Bridge and Victoria. This will reduce the London Bridge trains to 4tph from Peckham Rye, and cut all trains to Victoria in the evenings and Sundays.


The campaign to get those Victoria gaps filled is still continuing and though the signs aren't good in that we haven't lost hope that something can be done. see here for the latest on that campaign.


If we lose the battle this year for that timetable, we will be campaigning hard to get the full 7 days a week service to and from Victoria into the rail franchise to be renewed in 2014.


These campaigns to be successful depend on a lot of informed users making their views known at the right time. So please join the email list ? email: [email protected]

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • Posted around 12 cards 2 weeks prior to 24th December. Had some responses so know people have received them. Had about 20 cards - mixture of hand delivered and via post. After years of 'nagging' by myself and our daughters, we may have cured hubby of spending £4 plus on individual cards for our immediate family  ( when you have 12 immediate family it costs a bomb) Also as the girls state, they get put in the recycling bad at beginning of January regardless of cost.
    • There was a LETS scheme in ED and it ran for a couple of years or so. Trying to remember when it was pre 2000?  A couple of friends joined it, one did baby sitting for exchange for ironing, the other did small painting jobs or simple gardening. There was a set criteria regarding credits, 
    • Hi a bit tricky to run a train to Victoria from ED what way would it go on a new line 😂
    • @Sue I don't know if she took over the pub..it does'nt ring any bells but I'm in contact with her so I'll try and remember to ask.
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...