London Overground from Peckham Rye


ratty

Recommended Posts

The spur track south of Peckham (visible on trains from ED station going into London Bridge) seems to be well on the way to completion. I wonder if the work at Denmark Hill would stop the line itself being completed?


The Overground line could start running and just not stop at Denmark Hill until work there is complete. We could start to see ghost Overground trains using the new route to bed in.


It would also not surpise me if an early limited service was started in time for the Olympics - a nice bit of PR for the Overground and for Boris.

Link to comment
Share on other sites

TfL have told us (SRUG, Southwark Rail Users' Group) that the plan is to end the South London Line on 8th December and start the East London Line on the 9th December 2012. Indications are that all is on time.


From that point we will have the extra 4tph between Clapham Junction and Canada Water (Jubilee connection), but lose 2tph to London Bridge and Victoria. This will reduce the London Bridge trains to 4tph from Peckham Rye, and cut all trains to Victoria in the evenings and Sundays.


The campaign to get those Victoria gaps filled is still continuing and though the signs aren't good in that we haven't lost hope that something can be done. see here for the latest on that campaign.


If we lose the battle this year for that timetable, we will be campaigning hard to get the full 7 days a week service to and from Victoria into the rail franchise to be renewed in 2014.


These campaigns to be successful depend on a lot of informed users making their views known at the right time. So please join the email list ? email: [email protected]

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • You can't refuse. TW allows you up to a 12 months after installation during which time you can continue with the fixed rate system. Then after 12 months you go on the meter rates regardless. The one benefit of this is that the meter send readings on an hourly basis and if you have consumption being registered, when you would not expect it,  (such as between 1am and 6am) , they will advise you that you have a leak somewhere and will give an estimate of how much extra this leakage will cost you after you go on the meter rates.  That way you can fix your lea(s) in advance and save money. If you cannot find the leak  inside the house, it may be outside underground, between your house and the water meter because your old lead pipe may be leaking. That stretch of pipe is your responsibility.  Then you can ask them to help you find it and if you play your cards nicely and catch the TW guy on a good day, then TW will replace your old 1" pipe with a new blue 25mm pipe.  
    • Thank you to everyone who do drop off food while they were casting their votes, thanks also to those who enquired about volunteering. It doesn't have to be an election day though to do either though, so we would be grateful to receive donations and additional volunteer help any other day of the year too. We have also just added another string to our bow, and are now re-homing unwanted electricals too, so if you have any unwanted small electricals lurking at home that we can re-home, please drop them off to use to. We only ask that they are clean and working.  we will PAT test them and assuming all good, we will find a new home for them. The Community Fridge website has details, along with a wealth of other information Best wishes Steve Albrighton Community Fridge w: albrightoncommunityfridge.org i: albrighton_community_fridge_   
    • Hello, TW installed ours in SE27 in October 2023, unprompted too. We just got a note through the letterbox informing us of the switch to smart meter and its serial number, after it was done. 
    • I've recently moved into East Dulwich. I transferred my Thames Water account to my new address, and I  have received my bill for the year. But now I've received an email from them saying they'll be out on the 8th to fit my new smart meter, which was unrequested by me. I can probably refuse but I wanted to check here if perhaps there was a TW campaign to get these installed in the area? Thank you.
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...