Jump to content

Recommended Posts

I have just received the following notification about remedial works at this junction, on Saturday 6th April. If you can, I would suggest avoiding this junction on that date.


Renata




Dear Councillors,




Ref: Peckham Rye/East Dulwich Road -Resurfacing Remedial Works


This is to inform you that FM Conway, the Council?s highways term contractor, would be undertaking some remedial works at the above junction on Saturday 6 April.


We recently did some signal improvement works at this junction but the tarmac that was layed has failed.


Conways are therefore rectifying this at their own cost.-


This date would ensure minimum disruption to traffic.

We recently did some signal improvement works at this junction but the tarmac that was layed has failed.


Oh, huge surprise!


Conways are therefore rectifying this at their own cost


But not taking account of any consequential cost on the long suffering motorist or bus user who once again has to put up with delay and confusion, only seconds, it seems, after the last time.

Penguin68 Wrote:

-------------------------------------------------------

> We recently did some signal improvement works at

> this junction but the tarmac that was layed has

> failed.

>

> Oh, huge surprise!

>

> Conways are therefore rectifying this at their own

> cost

>

> But not taking account of any consequential cost

> on the long suffering motorist or bus user who

> once again has to put up with delay and confusion,

> only seconds, it seems, after the last time.



what do you think they should do then? stand on the corner handing out pound coins to long suffering motorists?

what do you think they should do then? stand on the corner handing out pound coins to long suffering motorists?


That would be nice, but the point I was making was about consequential loss, a perfectly accepted concept in civil law.


If you want a practical suggestion for recompense, then (making a not that bold assumption that the majority of those impacted were / are Southwark Council Tax payers), then some additional pro-bono work from Conways in Southwark (filling some pot-holes perhaps) which would have a general benefit in terms of more council tax money being available for other things would be nice. Because of their poor workmanship originally local people's lives are being additionally made worse (we should be prepared to accept necessary, but not unecessary disruption)

+1 to DJKillaQueen's comment - the road surface approaching this junction from the West (ie the Tesco side) is one of the most dangerous bits of tarmac for a cyclist in SE London. I had assumed that the original works would have included resurfacing this entire stretch - after all, the whole of the Colyton Road junction was resurfaced and that was in much better condition. Instead, it looks like they have selected about half the existing pot holes (seemingly at random) and then partially filled them, without levelling out afterwards (so some pothole became mini-hills in the road). I'll watch with interest to see if their second attempt is more successful... massive kudos to whoever in the council took them to task about it.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • Awful. A Google search came up with this, but will he check his office email over Christmas? Maybe worth also contacting local councillor? 'To contact Southern Housing's CEO, Paul Hackett, you can try his direct email, [email protected], or use the general contact email [email protected], as well as calling their main number, 0300 303 1066, for general inquiries or to be directed to the executive level.' Also, from the website: https://www.southernhousing.org.uk/latest-news/2025/contacting-us-over-the-festive-period   'Contacting us about an emergency? If you have an emergency outside of the above times over the festive period, such as severe flooding, an uncontainable leak, gas leak, complete electrical failure or lift breakdown, please call us on 0300 303 1066' I hope it is sorted out soon.
    • Dawson Heights again  2 lifts out of order at ladlands block Christmas Eve so of course the 🛗 will not be repaired tomorrow Christmas Day or Boxing Day or when how do elderly or mothers with children and prams and food and presents get to the floors and with the 10 minutes you get to drop off  to park and not get a Pcn fine and delivery food to relatives who can’t leave their house unbelievable Southern housing does any know email address of Coe of southern housing 
    • Sorry but I think it's best if people just check things for themselves when they buy things. In three shops/restaurants (from some years back) I just avoid the places concerned, as in all three  cases I was pretty sure it wasn't a genuine mistake, and in one place  it happened more than once and usually late at night.
    • Sorry Sue - me again. This has been on my mind all day, it's a big bug bear of mine. If you don't mind - please can you private message me some of these shops so I can cross reference / add to my AVOID list.  Thanks in advance. Let's make sure this doesn't happen this Christmas, particularly as we head into sales season. Even more problematic in my experience.
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...