Jump to content

Recommended Posts

Was it that bad? Well, doing an extended trip morning and evening every day was bad enough but to top it all up, there was yet another signal failure in the Sydenham area on thursday and some of us got left at Canada water without much information. Journey home ended up taking over 1h30. Good thing I did not have to pick up my daughter.


I get that it's all necessary but the problems yesterday started really grating with me.

I normally get the 8.40 (no longer alas) to LB, which means leaving the house at 08.30. Last week I left the house about 20 mins earlier than normal and walked to Lordship Lane to catch the 40 bus. None was remotely full (this was the Heber Road stop) and I arrived at LB pretty much on time. Yes, it took a bit longer but it wasn't remotely bad.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • He certainly comes across a rather decent bloke. Here’s a better one of him taking the knee with his players as an anti-racist gesture:
    • Europe, very much so, the whole of August is a write-off, if you want anything delivered from there, forget it, but there's no similar summer shutdown period in the UK as such, just people taking hols while kids off school etc. The nearest the UK construction sector has to a proper shut down is the Christmas/New Year period when, depending on when the Bank Holidays fall, there's an approx 10-14 day unofficial shutdown between Christmas and New Year... 
    • There's planning permission for 2 houses.  Southwark planning site is too slow today to use, but found this link from Savills to auction the site: https://auctions.savills.co.uk/auctions/19--26-november-2024-158/3335-hansler-road-east-dulwich-london-se22-9dj-13236   Edited to add that the inclusion of lower ground floor in the planning application description indicates that basements will be dug.  Looks like Fellbrigg/Hansler is up for some heavy construction traffic next year.   Links to planning documents: https://planning.southwark.gov.uk/online-applications/applicationDetails.do?activeTab=documents&keyVal=RZDIQMKBI2V00
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...