Jump to content

London Bridge is closed 23/8 to 31/8


TB2

Recommended Posts

London Bridge (Southern) station is closed for nine days from Saturday 23rd to Sunday 31st August 2014. Trains from East Dulwich will start and finish at South Bermondsey during this period. This will be very disruptive to people travelling to the City and Canary Wharf. Suggest anybody not on holiday that week goes to www.tfl.gov.uk and replans their journey.


The number 40 bus goes direct from East Dulwich to London Bridge. Also worth getting the East London Line from Denmark Hill or Brockley to Canada Water for Canary Wharf (there'll be extra services from Brockley). The 42 bus from Sunray Avenue is also a good link to City Hall, Tower Hill, Aldgate and Liverpool Street.

Link to comment
Share on other sites

Thanks. At least as significant seems to be that during the evening peak - from 1600-1900 - the number of trains from London Bridge to Peckham Rye / East Dulwich has been reduced to 4 per hour from 6 per hour. The remaining ones are not spaced evenly either, with 20 minute gaps between some trains.


CANCELLED TRAINS ?FROM LONDON BRIDGE

16:20 London Bridge to Selhurst

16:50 London Bridge to Selhurst


TERMINATING/STARTING SHORT TRAINS FROM LONDON BRIDGE

08:50 London Bridge to Beckenham Junction will start from South Bermondsey at 08:54

17:20 London Bridge to Wimbledon will start from South Bermondsey at 17:24

17:50 London Bridge to Wimbledon will start from South Bermondsey at 17:54

18:20 London Bridge to Wimbledon will start from South Bermondsey at 18:24

18:50 London Bridge to Epsom will start from South Bermondsey at 18:54

Link to comment
Share on other sites

worldwiser Wrote:

-------------------------------------------------------

> Does anyone know whether post Thameslink programme

> the intention is to have more tracks into LB than

> there were until now? Or just the same as before?



More through platforms, less terminating platforms.

Link to comment
Share on other sites

rahrahrah Wrote:

-------------------------------------------------------

> Looks like there is going to be a loss of two

> morning trains (7:31 and 8:15) post 1st September

> too:

>

> http://www.southernrailway.com/download/31749.9/27

> -june-september/


Well spotted, thanks for sharing the link. However, from reading the document it appears slightly differently.


7:31 is the time of the train departing West Croydon. This is the 08:00 service from East Dulwich which will still run but then terminate at South Bermondsey.

8:15 is the time of the train departing Beckenham Junction, which is the 08:40 service from East Dulwich. This also will terminate at South Bermondsey.


As djaq2000 pointed out, there's also the loss of the 17:20, 17:50, 18:20 and 18:50 from London Bridge (which will start at South Bermondsey). However, the other services out of London Bridge have been slightly retimed in order to spread the load.


Not so much impact if you are connecting to other services before LBG, but if your commute is from Dulwich to London Bridge, then that's a sizeable impact. The key peak services now will be:


East Dulwich to London Bridge (curtailed services marked as '-'):

07:09

07:20

07:30

07:40

07:50

-

08:10

08:20

08:30

-

08:51


London Bridge to East Dulwich:

17:10

17:25

17:40

17:57

18:10

18:30

18:40

Link to comment
Share on other sites

People in the city might find it walkable from Whitechapel or Shoreditch. Also trains from DH/PR to E&C, Blackfriars, Thameslink, and Farringdon. Plus the good old number 40 bus. Yeah it's a pain, but at least there are plenty of other options.
Link to comment
Share on other sites

No you don't get charged extra as Clapham High Street / Clapham North is classed as an Out of Station Interchange (OSI). In fact going this route is likely to be cheaper than going by London Bridge National Rail. So Denmark Hill - Moorgate for example is on Oyster PAYG ?4.10 peak and ?3.50 off peak going by National Rail at London Bridge but go via Clapham High Street / Clapham North it is ?2.80 peak and ?2.20 off peak. So if you currently do East Dulwich to somewhere in the City might be worth going to Denmark Hill instead
Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • I would suggest that anyone accidentally driving into the square is not paying due care and attention. If you disagree, I would be interested in what you consider a basic level of competence behind the wheel.
    • Yes, but as I have said before I have nothing to do with their organisation (other than subscribing to their updates which I then post on here). Sorry to disappoint you. I await your answers....
    • Hold on a minute, aren’t you the one posting regular updates from ‘One Dulwich’? 
    • No idea. Ask One Dulwich   No. There are two seperate issues. I believe some cover their plates deliberately (delivery drivers etc) and a number are confused by signage. I spend a lot of time in that area and have only ever seen one car drive through and it was an elderly couple who were incredibly confused (and subsequently very apologetic to an angry cyclist who was calling them all the names under the sun).   Some questions for you to answer now: 1) Which consultation are you referring to? 2) Did you agree with the council's insistence on keeping the junction closed to emergency vehicles despite the emergency services telling them it was delaying response times?   3) At a time of funding crisis do you think £1.5m is a good spend to redesign a junction and those redesigns: - potentially increase emergency vehicle response times - do nothing to stop persistent number plate covering offenders - do nothing to slow cyclists at a pedestrian area  
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...