StraferJack Wrote:

-------------------------------------------------------

> 2018 is completion of works

>

> I am caught up in the platform squueze every

> morning and it's a royal pain - but given teh

> scale of construction what do people expect

> staff/TFL to actually do?

>

> It is what it is...


Just tell me when it will stop - some say 2014, others 2015, now 2018.


The staff I've asked at London Bridge don't know.


I just want to be kept informed...

Link to comment
https://www.eastdulwichforum.co.uk/topic/51414-trains/#findComment-798420
Share on other sites

I'm not convinced that it's going to improve much until the works are finished in 2018, but hope I'm proved wrong. For me it just emphasises why we should be pushing hard for an extension of the tube network into SE London. We are totally reliant on the trains with no viable, high speed alternative.... I know we have buses, but they're so slow in rush hour, that they don't represent a viable commuting option for many of us. We pay for the tube network through our taxes, we should be served by it as much as those in other parts of London.
Link to comment
https://www.eastdulwichforum.co.uk/topic/51414-trains/#findComment-798430
Share on other sites

I can't really agree with this "I demand we have a tube line" stance, but I can agree that the current situation is unacceptable, and at times, dangerous.


The trains are now so tightly scheduled that if one train is delayed, the whole network goes bang and they start having to cancel trains or miss out stops. Half hour waits are commonplace, as are 25 minute journeys. There is a lack of useful departure information at London Bridge. And at the end of all this... we'll have one less platform than we did to start with.

Link to comment
https://www.eastdulwichforum.co.uk/topic/51414-trains/#findComment-798462
Share on other sites

Jeremy Wrote:

-------------------------------------------------------

> I can't really agree with this "I demand we have a

> tube line" stance


If you look at the tube map, I think it's obvious that SE London is massively under served. This should be a strategic priority for investment / expansion. I'm not suggesting East Dulwich necessarily, but SE London generally. An entire quarter of London is reliant almost exclusively on trains and buses and as a result, when things go wrong on the former, there is carnage on the latter, leaving people with few options.

Link to comment
https://www.eastdulwichforum.co.uk/topic/51414-trains/#findComment-798503
Share on other sites

StraferJack Wrote:

-------------------------------------------------------

> When will what stop? The whole project? 2018

>

> The shuffling along platform_15? That's probably

> got variables in play - I just accept it is

> unlikely to happen anytime soon


Just platform 15. That's all I care about.

Link to comment
https://www.eastdulwichforum.co.uk/topic/51414-trains/#findComment-798525
Share on other sites

rahrahrah Wrote:

-------------------------------------------------------

> An entire quarter of London is reliant almost exclusively on

> trains and buses and as a result, when things go

> wrong on the former, there is carnage on the

> latter, leaving people with few options.


So you think every area of London should be served by at least three forms of transport, as a contingency measure?


Don't get me wrong, I'd prefer a tube too... but I don't get the argument that carrying on without it is some sort of great burden. The current situation, while painful, is not permanent.

Link to comment
https://www.eastdulwichforum.co.uk/topic/51414-trains/#findComment-798547
Share on other sites

StraferJack Wrote:

-------------------------------------------------------

> Ah I see ? just like fazer71 and his planes noise

> threads

>

> ?I don?t care if everything is interdependent and

> connected, just fix my bit?


As it happens, I'm affected by the other parts too (no Charing Cross trains stopping from Jan 2015 to August 2016. Closure from 20 December to 4 Jan.).


But no-one seems to be able to give me a concrete answer to this one question.

Link to comment
https://www.eastdulwichforum.co.uk/topic/51414-trains/#findComment-798555
Share on other sites

I just think that it is ridiculous that the tube network has a massive hole in it. That out of 270 stations only 5 in SE London, outside of Zone 1 and yet it doesn't get addressed. Instead money from the transport budget is used to fund tourist attractions like the Emirate Dangleway, the garden Bridge and vanity projects like the 'Boris bus'. The latest extension of the northern line serves an area where there is no current demand or existing community - it's is just a huge public subsidy to a development of luxury flats. So yes, I think it's reasonable to demand that transport priorities shift, so that the budget is used to improve provision for existing London communities, rather than serve the interests of property developers or the mayors ego.
Link to comment
https://www.eastdulwichforum.co.uk/topic/51414-trains/#findComment-798558
Share on other sites

I prefer to look at holes in the "transport network" rather than purely the "tube network".


A once-a-ten minute train service to London Bridge - with easy interchange to Charing Cross - would be a perfectly respsectable service. If it worked. Without engineering works every. single. weekend. since. ever.

Link to comment
https://www.eastdulwichforum.co.uk/topic/51414-trains/#findComment-798598
Share on other sites

  • 4 weeks later...

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • Miss Robson is the last of the old school independent vets. All the chains are have seriously hiked their prices over the last few years which now makes pet ownership only possible for the wealthy few. Even with pet insurance -( which often excludes items or has ‘deductibles’ ) it is just so much money. A visit with some medication is often £150 - £200. The vets themselves are excellent. 
    • Awful. A Google search came up with this, but will he check his office email over Christmas? Maybe worth also contacting local councillor? 'To contact Southern Housing's CEO, Paul Hackett, you can try his direct email, [email protected], or use the general contact email [email protected], as well as calling their main number, 0300 303 1066, for general inquiries or to be directed to the executive level.' Also, from the website: https://www.southernhousing.org.uk/latest-news/2025/contacting-us-over-the-festive-period   'Contacting us about an emergency? If you have an emergency outside of the above times over the festive period, such as severe flooding, an uncontainable leak, gas leak, complete electrical failure or lift breakdown, please call us on 0300 303 1066' I hope it is sorted out soon.
    • Dawson Heights again  2 lifts out of order at ladlands block Christmas Eve so of course the 🛗 will not be repaired tomorrow Christmas Day or Boxing Day or when how do elderly or mothers with children and prams and food and presents get to the floors and with the 10 minutes you get to drop off  to park and not get a Pcn fine and delivery food to relatives who can’t leave their house unbelievable Southern housing does any know email address of Coe of southern housing 
    • Sorry but I think it's best if people just check things for themselves when they buy things. In three shops/restaurants (from some years back) I just avoid the places concerned, as in all three  cases I was pretty sure it wasn't a genuine mistake, and in one place  it happened more than once and usually late at night.
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...