Now it's finished it looks half-arsed and badly done.


The elevated section of NthX Rd is particularly ugly. Compare it with the same deal at the end of Chesterfield Grove diagonally opposite -


This has two types of block-paved surface in contrasting colours for the raised section and the ramps either side. Most of the side roads treated in this way are the same. Not Nthx though. NthX Rd has multi coloured blocks on the elevated section and badly laid banks of tarmac either side for ramps making it look half-finished at best and bodged at worst - like it had to be hurried up or they ran out of money.

James Barber Wrote:

-------------------------------------------------------

> Blame the councils mismanagement for the

> disruption - poorly managed contractor.

>

> Blame me for the diea of improving this junciton.

> I never imagined in my wildrest nightmares the

> implementation could be so hopeless. I applied for

> this to happen in 2013!

> If ever their was a case for great devolved local

> government. Managing a contractor from SE1 to do

> these works clearly hasn't worked in any way shape

> of form.

> In November Southwark's administration is throwing

> a party to celebrate it's creation from two other

> councils 50 years ago. Would the old Camberwell

> Council that included Dulwich with its highways

> yard just of off GRove Vale have allowed a

> contractor to do this - very much doubt it.



You seem to be saying sorry for many things just lately, what are you setting us up for that might appear in the future?

edhistory Wrote:

-------------------------------------------------------

> > In November Southwark's administration is

> throwing a party to celebrate it's creation from

> two other councils 50 years ago.

>

> Over six months late.

>

> The "merger" was on 6 April 1965.


Have Conways Senior Management and board of directors been invited.. ?


DulwichFox

@edhistory Lordship Lane Cycle Superhighway (AKA "CS6 Penge to City") is dead and buried, and has been for a year or more.


The map you've got there is a Southwark Spine proposal, more akin to a Quietway (i.e. back street route, some junction tweaks and traffic calming) than a Cycle Superhighway (big wide blue paint strips along a main arterial road, or a segregated bike track in their new incarnation). Doesn't run past this junction.

Meeting yesterday first thing to review these works:


"

North cross Road /Lordship Lane Schedule of Defects

1.Outside Londis shop BT box to be squared in line with the slabs.

2.Repoint core holes around bike stand.

3.Chipped kerbs stones kerbstones patched

4.Chipped slabs replaced

5.Make good and repoint channel sets

6.BT box at the bus stop cover dropped


Out standing

7.Waiting for UK power network to disconnect and removed disused lamp column and replace slabs area.

These defects will be corrected soon and you will be notified on completion.

"


Just waiting dates for these to be fixed.

Sue Wrote:

-------------------------------------------------------

> solar Wrote:

> --------------------------------------------------

> -----

> > Surely after all this time the job should be

> > perfect first time.

>

>

> Indeed. Poor management, on the face of it.


Poor management... Poor workmanship.... = Wrong choice of contractor..


Down to Southwark Council.


DulwichFox

I've lost track of the number of shoddy jobs I've seen Conway involved with. If you email the council, no-one replies. It's almost as if by not replying they believe they can retain total deniability. Do Conway have a lengthy iron-clad contract or something which makes it nearly impossible to fire them?


FOI request moving along, should have response by end of month.

worldwiser Wrote:

-------------------------------------------------------

> It's almost as if by not

> replying they believe they can retain total

> deniability. Do Conway have a lengthy iron-clad

> contract or something which makes it nearly

> impossible to fire them?


Of course - low above-the-board cost but juicy below-the-board 'benefits'. Same as it ever was. Good luck with FOI request.

James Barber Wrote:

-------------------------------------------------------

> Meeting yesterday first thing to review these

> works:

>

> "

> North cross Road /Lordship Lane Schedule of

> Defects

> 1.Outside Londis shop BT box to be squared in line

> with the slabs.

> 2.Repoint core holes around bike stand.

> 3.Chipped kerbs stones kerbstones patched

> 4.Chipped slabs replaced

> 5.Make good and repoint channel sets

> 6.BT box at the bus stop cover dropped

>

> Out standing

> 7.Waiting for UK power network to disconnect and

> removed disused lamp column and replace slabs

> area.

> These defects will be corrected soon and you will

> be notified on completion.

> "

>

> Just waiting dates for these to be fixed.


James, will there be a meeting to review this project to work out just why it took so long and how much it ended up costing?


thanks

I would not want anyone to get the wrong impression from Jim's post. He did not actually attend the meeting the other morning in Lordship Lane at 8am with Southwark Council Officers and a representative from Conway's. I was there at eight and pointed out the chips and the cracks and the badly laid slabs. I too am unhappy with the time this job took and will be asking the reasons why. As for JB, I think it is about time he stopped taking credit for nearly everything that goes on in East Dulwich. I am sure that if England had won the rugby world cup, he would have said it was down to him! So let us all get on serving the people of East Dulwich and not blowing our own trumpet.


Regards


Councillor Charlie Smith

Labour Member East Dulwich Ward

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • It's usually a combination of "nearly Halloween", "nearly Bonfire Night", "weekend" and "dickheads". You can adjust the sliding scale on each of those factors most nights for the next 3-4 weeks.
    • I have a relative visiting who would appreciate one of these to help with bathing.
    • Quite a few going off tonight. Diwali is over, or so I thought. Anyone know what the special occasion is?
    • I got this  interesting email today. At least some (albeit apparently very few) shoplifters seem to have been arrested, though I wonder what the criteria were. Obviously that is only the ones arrested as a result of this particular initiative. Met Engage Logo Joint Partnership Success – Operation Roscoea, Southwark We’re pleased to share the success of Operation Roscoea, a joint partnership anti-social behaviour (ASB) initiative carried out in Southwark last week. This multi-agency operation saw eight partner representatives from six support organisations conducting outreach patrols alongside officers from our Trust, Confidence and Engagement Team. These joint efforts led to numerous new referrals into support services, ensuring vulnerable individuals are connected with the help they need. Neighbourhood policing teams also carried out joint patrols with Southwark Council wardens, who now hold newly designated enforcement powers. This enhanced collaboration has strengthened our collective ability to respond to ASB and community concerns. Operational highlights included: Six arrests made by officers from North Southwark Town Centre Team, St George’s, North Walworth, Faraday, Newington Ward, Chaucer, and the Proactive Crime Team: 2 for possession of a Section 5 firearm (CS spray) 1 for possession of Class A and B drugs 1 individual wanted for theft 2 for shoplifting ASB enforcement activity included: 2 Community Protection Notices issued to persistent offenders Numerous intelligence reports submitted to support ongoing investigations This operation is a testament to the dedication and teamwork of our local officers and partner agencies. Thank you to everyone involved for your continued commitment to making Southwark safer and more resilient. We look forward to building on this momentum in future deployments. Message Sent By Gary Thomson (Metropolitan Police, DC - Staff Officer to Superintendent Brockway, Southwark) You are receiving this message because you are registered on Met Engage. 
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...