beaver14uk Wrote:

-------------------------------------------------------

> Well there were certainly workman there on Friday

> as I was in the area. At the end of the day its

> an emergency gas leak so sadly you have to put up

> with the disruption.


If it was an 'emergency', they'd have fixed it by now.

With sub zero temperatures I don't believe concrete sets. Every at just above zero temperatures concrete setting must be slow. This must be severely limiting the speed of reinstatement and cause much of the delays - unless a road works conrete setting expert on the Forum can advise otherwise?
Yep you are correct, concrete should not be poured as ice crystals will form, also, the asphalt surface course can not be laid at these temperatures, also the plastic gas pipes are heat welded together which would be very difficult in this wet and cold weather

They are temporary signals you cannot phase them like the permanent signals owing to limitations in the equipment and lack of signage on the temporary signals to display banned turns and exceptions.


Temporary signals also lack any features like the fixed signals to vary their timings dependant on demand, which is making the problem worse.

skidmarks - that's not true! They can of course be phased more efficiently. Admittedly now, North and South traffic flow will not be able to move at the same time now (since only one lane is available now), although I don't understand why East and West cannot (as was allowed with the permanent set).


Temporary lights can come with sensors to allow for dynamic phasing - they just haven't bothered.

Ok you obviously know more than me as it has been a number of years since I played with temporary signals. This is how I remember the phase controller for portable signals looking for 4-way control (Picture). I cannot see how you link two phases to be green at the same time without the conflict light coming on.
I noticed they recently put up a little sign on the West part of East Dulwich Road informing us that it's not a pedestrian crossing. You wouldn't have thought it would be all that hard to make it safe and suitable for pedestrians.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • I'd be tempted to put up some sort of fence  to delineate the area and see what happens. Probably nothing.
    • Poundland have been there just over two years. 
    • Has anybody here bought some land from the council to become part of their garden? There are helpful guidelines on the Southwark website here including a PDF with associated costs, however the "valuation" element has absolutely no guidelines. It could be £500 or £50,000. You will already have spent £1000 on the process before finding out what they will charge you for the land - which would certainly be frustrating if it's not affordable for you. The land in question is a tiny patch immediately attached to the front of my property, approx 4 meters wide x 1 meter long. Would like to put a fence there to separate from the pavement and allow some privacy, keep the bins more tidy. The land is of no value to anybody else and is neglected currently - the council seems to have to stopped maintaining this area between the pavement and the houses on our street.
    • I suppose wind could have blown rubbish out of bins down into the pond. But I also counted three footballs and some smaller balls. Regrettably, there is also what seems to be a large dead carp or waterfowl, hard to tell at distance. I just hope the water quality is okay. I am not clear to what extent the pond is managed.
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...