Jump to content

Recommended Posts

KidKruger Wrote:

-------------------------------------------------------

> slight distraction - but has the Denmark

> Hill/Peckham Rye train to Highbury really stopped

> running straight-through ?

> I checked a week or so ago and it looks like now

> the only way to make the Overground train journey

> is by changing at Canary Wharf.


Hasn't it always been like that? Certainly there are no direct trains on the current timetable (from May 15th) but as far as I recall it's always been necessary to change at one of the stations between Canada Water and Dalston Junction to get to H&I. Perfectly willing to stand corrected but I really can't remember there ever being a direct service - and I was living in Denmark Hill when the line opened.

I'm pretty sure there was a direct service, because I was mega pissed off when it started.


I used to work in Islington and it was a pain in the **** to get to from ED, so that service would have saved me hours of commuting ......


Sadly I left the job before the train started running .....

KidKruger Wrote:

-------------------------------------------------------

> slight distraction - but has the Denmark

> Hill/Peckham Rye train to Highbury really stopped

> running straight-through ?

> I checked a week or so ago and it looks like now

> the only way to make the Overground train journey

> is by changing at Canary Wharf.


Yes hasn't been running direct since January

Sue Wrote:

-------------------------------------------------------

> I'm pretty sure there was a direct service,

> because I was mega pissed off when it started.

>

> I used to work in Islington and it was a pain in

> the **** to get to from ED, so that service would

> have saved me hours of commuting ......

>

> Sadly I left the job before the train started

> running .....


I stand corrected by Mrs H - when she was working up near H&I four years ago apparently there was a direct train from Denmark Hill. My bad.

The volume and extent of overground trains has actually increased over time, I suspect some linkages have been rationalised - I would hope on the basis of passenger surveys. The H&I trains run regularly through Forest Hill and Honor Oak Park to Canada Water and then up - so those on the PR route can readily change there. PR is on an east:west route, which crosses the north:south route (Croydon to H&I) at Canada Water - making that an interchange has some logic to it, and probably allows a larger number of trains to serve both routes.
They're turning some trains around at Dalston Junction - afaik the eventual plan is to have 20 trains per hour between Surrey Quays and Dalston, with half turning at Dalston and half at Highbury. But with 10 an hour to Highbury, it's never a long wait even if you have to change.

cle Wrote:

-------------------------------------------------------

> How would the 20 trains per hour work? All four

> lines going from 4 to 5 each per hour?


I thought the plan was to add another two trains per hour on the Clapham Junction and Crystal Palace branches, this would be 20 trains per hour between Dalston Junction and Surrey Quays.


New Cross and West Croydon would be left with 4 trains per hour each, Clapham Junction and Crystal Palace 6.



Currently 16 trains per hour run to Dalston Junction of which 8 continue to Highbury and Islington via Forest Hill.

LouiseC Wrote:

-------------------------------------------------------

> Yes there was a H&I direct train daily up until a

> few months ago, oddly I think they may still run

> on weekends but not weekdays, I could be going mad

> but I'm sure I saw one on the departures board at

> Peckham Rye on the weekend?



I'm pleased you said this because I was convinced I got one train to H&I direct from DH only a couple of weeks ago...but it was on a Sunday, so that explains it and I'm not going nuts. Thanks!

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • A belated recommendation for Iain and Paul od Oddbods who came to help me with various jobs before Christmas.  Painting ceiling, renewing silicone around bath, repairing a window sill which was almost beyond repair and hanging a large mirror.   Very happy with their work and they are friendly and very reliable and excellent at communicating.  No hesitation in recommending them.
    • I just wanted to post for all my neighbours a recommendation of Niko, the wonderful plumber who works locally. Niko has done work for me over the years, including large and small jobs. He recently replaced four radiators in my house which have helped us really be warm for the first time! I recommend Niko so whole heartedly because (1) he is completely straight forward and will advise you not to do something / a cheaper solution, if that is what is best for you; and (2) he is one of the kindest and most honest people I have ever known. He goes the extra mile to sort out problems, particularly urgent ones.   
    • Scaremongering - there is very little vacant land in East Dulwich available as sites for building 9 storey buildings so this is rather hypothetical. It could even be said the occasional taller, modern building breaks up the monotony of Victorian terraced housing.
    • This is simply untrue. The area is not 2/3 storeys maximum. Hambledon Court is on the other side of tracks from the Jewson site on Burrow Rd, is 8 storeys, and is barely known (let alone bothersome) to most people in East Dulwich. Felbridge House, Petworth House etc on the opposite side of the station from the new development are all 5 storeys tall. East Dulwich Charter (which neighbours the new development) is itself 4-5 storeys (depending on which block you're talking about). What's more, Hambledon Court was finished in about 1978 iirc and no-one has built anything similar around here since then - so the "slippery slope" "genie in the bottle" argument doesn't work either. You can't simultaneously argue that Southwark is too slow in approving new construction but also suggest this will lead to a flood of new high-rise housing! At current rates of approval, we can expect our next 8 storey building to arrive in...2072!
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...