I reported a leak on Stuart road the 3/3/18 to Thames water 10 days ago, this has still not been dealt with. After speaking with Thames Water they said that council has not released a permit to work on this. I really believe the councils system should be sped up in situations like this. My daughter filled a 5 litre bucket in 10 seconds so that makes 432,000 litres of water wasted. Really this in outrageous amount of water, what is southwark council?s position on reducing energy loss and saving the environment.
Link to comment
https://www.eastdulwichforum.co.uk/topic/185472-water-wastage-by-southwark/
Share on other sites

Utilities can apply for an emergency traffic management order. This strikes me as a suitable one.

Renata is contacting council officers. I'll contact Thames Water to highlight how much water they're losing their and suggest this is an emergency.


On Sunday I escalated a longer delay from a much smaller leak and they're now fixing it. In that case the repair was delayed the council allowed Thames Water a permit to dig the road up but when they attended site to undertake the works the council was relaying the tarmac for the whole road and told them to go away. Left and right hand at Southwark Council not talking to each other or ensuring conflicts in street permits.

put this on twitter! and tag them at the end of the post, it will come to the top of their page!


Facebook too ( dunno if they have a page )


I have the same thing on Overhill road, and the road has been freshly laid.

At least a week ago now, and no one has come out ( haven't reported it though )

One would assume Thames will be using remote Water Pressure Monitoring.


This simple system would flag up (Alarm) any drop in pressure caused by any leak

and give a good indication where the leak is.

Thames should be aware of any problem before it was evident to the public.

DulwichFox Wrote:

-------------------------------------------------------

> One would assume Thames will be using remote Water

> Pressure Monitoring.

>

> This simple system would flag up (Alarm) any drop

> in pressure caused by any leak

> and give a good indication where the leak is.

> Thames should be aware of any problem before it

> was evident to the public.



That's interesting. I wonder why they would bother having a system for the public to report leaks, if it's all being monitored remotely? That seems a bit of a waste of staff answering phones and logging emails, or whatever the report system is.


But I have no idea what technology they have.


However, even if they are aware of all leaks, it doesn't mean they have the resources to deal with them all immediately, particularly after icy weather like we have just had.

bobbsy Wrote:

-------------------------------------------------------

> And Overhill Road as well. With the cold weather

> there is potential for dangerous ice.


That one I reported a couple of days ago. It's only a small leak so guessing it's not high on the priority list.

There was a main leaking on Fenwick road the start of the year as well. After a few days there were notices on the cars from Thames water, so they were aware of the problem, and still took another 10 days to fix. Agree with OP that it's crazy that such a leak could be allowed to go on for so long. I imagine that in addition to the wasted water its probably caused erosion under the road surface that will need to be repaired at some point.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • I'd actually go the whole hog and do a fondue, we all remember them fondly from parties in the last century or trips to Switzerland.  As long as it is cheese, not chocolate, urghhh
    • Gosh, that all sounds so familiar!  Southwark are constantly holding up their Outdoor Events Policy as proof of process, but then constantly allow exceptions when things aren't quite done correctly. Point in case, Gala's licence application - extract from the Consultation Findings Report - "The GALA team formally submitted their application to hold GALA 2025 to the council on the 7 October 2024. It is usually a requirement that applications for larger scale events are submitted with a minimum of 9 months to process them, but discretion can be applied if there are mitigating circumstances. 8.4 of the Outdoor Events Policy clarifies that processing applications received outside the stated lead-in times is at the Council's discretion. In this case: • The council were aware that Assembled Gala were preparing an application for the event to take place in 2025 in advance of their submission date, with operational discussions already taking place • GALA festival has been taking place in Peckham Rye Park since 2018 – less time is needed regarding event planning than if it were a new event • The GALA team already have a Premises Licence in place for this event (this is a pre- requisite for the Event Licence to be issued), so no time needed to be factored in for a premises licence application and decision-making process" So despite the fact that there would need to be major planning decisions due to the change of site access, they didn't think Gala needed to adhere to the same rules as everyone else? Makes me wonder what other rules they are exempted from... On a similar note, has anyone received a Resident Communication letter, containing the contact details for issues? We haven't, and we live directly opposite the site on Colyton Rd. They were supposedly distributed on 29/4...
    • We find that just adding your own favourites is the best way - everyone likes different things and your guests will likely be happy enough
    • Sue, if you put on a Dog mask, I'm.sure Bob will say "nice bit of wensleydale Grommit?" to you at the drinks 