Hello,

I know this is a tricky one to answer but would anyone know the ball park figure for a side return and loft extension?

SR is going to be about 25 square meters when finished - and only going out to side of house.

Loft will create two bedrooms and shower room.

I'm asking as we've had quotes from ?90k to ?175k, and I'd be interested to know which end of that scale is most realistic.

Thank you

Link to comment
https://www.eastdulwichforum.co.uk/topic/48024-side-return-and-loft-extension/
Share on other sites

175 sounds over the top. we have had a few quotes for the same thing and reckon about 110 is a more realistic figure - but obviously each case/house is different and will throw up different issues. also we are only looking for a one bed/bath in the loft In the end we have decided not to do the side return - it's just too much cash for what you get and with the market a bit shaky there's a strong possibility you'd never see the money back. just my thoughts.


good luck

In my experience, for a side return on it's own you are looking at 60 for the build only and 100 in total when you add in new good spec kitchen, flooring, lighting, doors etc. All aspects can be done more cheaply but you risk the quality of the finish so if you have the budget then do it properly, we used Plus Rooms.


Loft conversions are a lot easier and you should prioritize a side return specialist as your builder.

We are currently looking at doing this and in the process of getting quotes however as we talk through what we want its easy to see how the spec adds thousands.


in terms of side extension we are looking at a similar design to http://www.rightmove.co.uk/property-for-sale/property-46134893.html


in terms of Loft we are looking at One bedroom, one study and separate shower room.



even still the spec within these structures can add thousands.

KidKruger Wrote:

-------------------------------------------------------

> For me, it's get the builders to put the structure

> up and make it weatherproof then run with it from

> there doing what bits you can yourself / bringing

> tradesmen in.


There's probably something to be said for that approach. All too often the finish is rushed because the builders want to move onto the next job.

Jeremy Wrote:

-------------------------------------------------------

> KidKruger Wrote:

> --------------------------------------------------

> -----

> > For me, it's get the builders to put the

> structure

> > up and make it weatherproof then run with it

> from

> > there doing what bits you can yourself /

> bringing

> > tradesmen in.

>

> There's probably something to be said for that

> approach. All too often the finish is rushed

> because the builders want to move onto the next

> job.


In theory a good idea, but if there are problems going forward, it is nigh on impossible to get anyone to take responsibility, they always blame the other tradesmen.... We found this and ended up massively out of pocket and it cost twice as much to put right (this was even using a project manager who also passed the buck) - if we ever do work on a large scale again, we will use one firm to do everything...

if you can get the structure up, without having to worry about finishes, cabinet sizes etc. you can concentrate on that first phase with less distractions. Obviously there may be some items you need to have decided in front ie. if you're having underfloor drainage, where roughly the waste entry points will be.

mrcee Wrote:

-------------------------------------------------------

> Thanks, certainly some food for thought and I am

> leaning towards getting structure including

> flooring in place 1st.


If you know a bit about building fair enough - but if not I'd recommend you use a builder who project manages and provides all of the other services as part of the initial quote, electrics plumbing etc. then he is responsible for them being available at the time they are needed.

mrcee - the link you've put up is the exact thing we're after!

I think it would be reassuring to hear from someone who's done a similar side return and loft extension, who could confirm that total cost was actually ?xxx amount.

It seems a daunting prospect to set out on this build without knowing what the final figure will be, and only have an estimate.

eek!

  • 2 weeks later...

I've done a loft and side return (at the same time).


The pure building costs for the extension will be circa 40k plus VAT and for the loft 45k plus VAT. So around 100k including VAT. However, to that you need to add all of the following:


? Measurement survey, engineering drawings, Thamses water fees, building control fees and Planning / certificate of lawfulness fees: 3k

? Architect fees: 12% of build costs if they project manage the build as well so 12k

? New Kitchen- 5k to 50k depending on what you want (12k for midrange with appliances)

? New flooring costs for extension and rest of kitchen: 750 to 2,500 depending on what you want

? Underfloor heating (if you want it): 2k

? Moving boiler / changing heating system to cope with larger house: 2k-4k

? New kitchen electrical fittings for kitchen: 1k to skies the limit depending on if you want LV lights, fancy chandeliers, how many sockets you want and what kind of finishing (chrome, flush, etc)

? Bifold doors and Velux windows (if you want them)?2k to 10k depending on what you want

? Flooring costs for new bedrooms and bathrooms and stairs: 2k to 6k depending on what you want

? New Bathroom suite- 1k to skies the limit

? Do you want to add in a ground floor bathroom under the stairs? Add 2k for that.

? Redoing your garden which will be wrecked?can be thousands!


All in 150k assuming you do nothing else to the house would be fair budget if it?s a mid market finish. It can easily be much more if you have expensive tastes.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • I would ask a solicitor. You may be able to claim compensation. You can speak to Lease free for 15 minutes ( very worthwhile), and a no win no fee Sol.
    • I am no expert by any means, but I wonder first if Foxtons belong to any kind of professional (I use the term loosely) body you could complain to, and second, if you have any grounds to take them to the small claims court. I am surprised and sorry that none of the people you have asked for help could actually help. To be fair, though, re the oven, they have offered to reimburse you for an air fryer, it is the weekend so probably difficult to get someone out to look at it,  and they seem to be addressing that problem at least pretty promptly? Do you have a grill and hob and kettle working OK? Also, is it not the owner's responsibility to address issues such as the mould and the bath?  Shouldn't Foxtons be liaising with them about this?  Oh, and this is not intended to be a joke - try asking ChatGPT (or similar) what you can do. It saves hours of googling  stuff online yourself.
    • Agreed! I have been happy with them for the last 20 years.
    • Hi,   I'm posting here because I am completely at a loss for how to deal with this anymore.   Is this standard for dealing with a letting agency? I'm new to living in the UK and I've been treated abhorrently by this agency from day one.  I've reached out to every organisation I can - the council, Shelter, trying to get to the property ombudsman, and the citizens advice bureau. My oven broke last night (Friday) and their solution until someone arrives (Monday) to even inspect the problem, is to buy an air fryer.    This is part of a long list of issues, including my bathtub joist that's rotted out and has broke so my bathtub is now falling into the floor, and has been that way waiting for repair for the last month. Our flat is extremely cold in the winter (due to failing the EPC) and the rising damp throughout the flat has not been addressed even though we've been reporting it consistently for the past year. All they do is send someone to install a dehumidifier for a week. Every time I need assistance from these people I have to wait on hold each step of the way, my property manager is out of office or they're on another line or I can't speak to them, if I begin an issue with one person at the organisation I get redirected to a new person (and that initial person is now unavailable), or they wait a week to call me back. It is truly unbelievable the amount of stuff I've had to live with under Foxtons. They wouldn't allow me to move into our property on the first day stated in the lease I signed (after I paid depot and first month) because they didn't do the work to make the property pass the EPC which they had multiple weeks to address. During those multiple weeks I would call them everyday asking for status updates. When the move in day arrived all they could say to me was 'we can't help you'. They didn't even do any work to resolve it in the long run, they just got a new inspector to give the flat a pass. This company has made my life hell for the past year and unfortunately I am stuck in the lease for now due to their shady letting agent practices.   If anyone can please provide me some tangible assistance that would be greatly appreciated. Reaching out to any of these agencies has not brought me any closer to a resolution and my partner and I are beyond our wits end dealing with property issues. I thought a letting agency was held to a higher standard than a private landlord and was supposed to make life easier for a tenant but it appears to be exactly the opposite.   I've attached some mold images so you can see what my flat looks like if I don't run a dehumidifier 24/7.
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...