Total gridlock this evening (wasn't great this morning), from Burger King/Lidl right back along Bellenden/Highshore/Lyndhurst in both directions because Bellenden is completely closed between Holly Grove (Ganapati corner) and Blenheim Grove due to railway bridge replacement. Sign says its going until early June. Avoid if you can.

I got caught up in it this morning. Absolute nightmare.


Took me an hour from B&Q Old Kent to East Dulwich.


Normally go through Pomroy St but got caught up on Nunhead lane closures last time so


thought I'd take Peckham Bellenden Rd option. Big mistake.



Foxy

This came out of nowhere to me (and to a lot of other people, apparently). No leaflets about it or anything. What's the plan for rerouting traffic while this happens? I didn't see any redirection signs anywhere, just lots of drivers stuck in endless queues and perplexed cyclists.

Took me 45 mins to get home from bushy hill road to oglander nightmare , traffic

Coming down lynhurst is being sent on a loop,

As you can't turn onto bellenden you get sent back onto Peckham road .

This is apparently for a month ( that prob means 2 months )Really bad planning :(

cosmonaut Wrote:

-------------------------------------------------------

> This came out of nowhere to me (and to a lot of

> other people, apparently). No leaflets about it or

> anything.


Nothing I can see on Southwark's website for road closures, and I haven't see any of the usual lamppost signs - perhaps it's an emergency?

I noticed a sign at the junction of Bellenden and Peckham Rd ,near Lidls ,last week .


But I'm guessing this wouldn't have been seen by people using Lyndhurst Grove /Lyndhurst Way to join Bellenden Rd further south by Ganapati .


So possibly poor signage rather than unplanned works ?


Certainly caused major problems on Peckham Rd .

A trip to Kings yesterday via what I assumed would be a easy stop off at Lidl Peckham, resulted in over 1 hour and 30 minutes in delays.


Best thing you can do if coming from Camberwell is to go back up Denmark Hill past the Fox on the Hill and then a left down towards the village. I feel sorry for people who live on the likes of Highshore RD who have no choice but to join the chaos to get out.


Louisa.

This is causing chaos.


I live near there and received notification about this but it was my understanding that the works were only going to be completed at night. They made mention to noise implications regarding this.


Currently the only diversion is for traffic to go back down Bellenden road by Lidl and through the traffic lights which only let about one car through at a time onto Peckham road. Obviously they can't go round to camberwell grove as that bridge is still closed. So there is currently a massive queue to get anywhere and peckham road is gridlocked.


I've just seen a car drive fairly agrresively the wrong way round the one way system and onto the blind corner of chadwick road.


Is there anything that can be done about this? It seems like particularly poor planning.

Yep, if this isn't due to an emergency it certainly is dreadful planning. Seems to me that you won't find out (at least without modern tech) that there's a closure until you become part of the related jams. Would've been good to get Camberwell Grove open before this started surely...?

These are works being done by Network Rail who have been responsible for organising the closure. The Rye Lane Councillors and Cabinet member have had several complaints and they have contacted officers who are liaising with Network Rail so that they find a less disruptive set up.

Renata

SpringTime Wrote:

-------------------------------------------------------

> Yep, if this isn't due to an emergency Would've been good to get

> Camberwell Grove open before this started

> surely...?

You'd think. We have been leafleted about tha Camberwell Grove work being done later in the summer. Why they couldn't have done that first before doing the work on Bellenden Road is beyond me. They have created a bottleneck with only one exit. The level of incompetence involved in the planning of this is quite staggering.

Of course !! Make life as difficult as possible and try and catch people out. Well done southwark council

They need to rearrange some one ways into two ways to make navigating that area possible. With the double whammy

Of camberwell grove shut the diversions are mind boggling. But i suspect that s half the satisfaction for the council.

This may be of interest, a reply received regarding the Bellenden Road Closure. People may know different.


RE: Bellenden Road Bridge Replacement

CR South East

Today, 16:01

You

Dear Mr Jones




Southwark Council has forwarded a number of complaints to Network Rail over recent days and the following message is designed to respond to those concerns raised with regard to the essential bridge replacement that is taking place on Bellenden Road, which is to replace a life expired bridge to allow the continuation of the train service in this area and to carry out improvement works to the Camberwell Grove bridge to open the bridge to traffic under 3 tonnes. Firstly, we would like to apologise for any inconvenience and disruption that these improvement works may be causing you. Network Rail and Southwark Council have been working closely together to try and mitigate and minimise as much disruption as possible, but due to the nature of the works there will regrettably be some disruption.




Network Rail and Southwark Council have to maintain their infrastructure for the safety of the public and to protect train passengers. However, due to limited railway closures to deliver both schemes as efficiently as possible we required the closure of all four railway lines for 72 hours. The May Spring bank holiday has given us the opportunity to carry out these essential works to both of the bridges. In the early stages of the project, an increase in traffic a certain times of the day is anticipated, however, this was compounded on Tuesday with a broken down vehicle on Peckham Road for a number of hours that reduced the road to a single lane.




Today, Thursday 10th May, Southwark Council and Network Rail have reviewed the signage on the diversion and taken into consideration the feedback from yourselves and have taken the steps to improve the signage where necessary , including placing traffic marshals at Bellenden Road at the junction of Holly Grove and Blenheim Grove at the junction of Bellenden Road, improving the signage at the junction Lyndhurst Way and Peckham Road. During a walkabout this morning, traffic was flowing well in the area.




We would like to take this opportunity to thank you for your patience and your kind co-operation during this time.




We will continue to monitor the situation.




Kind regards


Paula Williams


Network Rail

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • I was woken around midnight the other night as a Lime man tried to untangle a heap of three bikes someone had piled on my driveway. They block the pavements and people knock them over in frustration. I wrote to Lime and told them that in future any bikes left near my property would be securely stored away for collection at a mutually convenient time for both parties. I confiscated one at the weekend but a man knocked on our door looking to rent it while I was at work and my son gave it to him! I told Lime it's not fair of them to push the problem on to the local collection depots, they create the problem by allowing users to dump the things wherever they like. If they were penalized for doing so that would put an end to it.
    • The SDCAS Crowdfund campaign is now live: Help Save Southwark Day Centre for Asylum Seekers! "I’m proud to be an advice volunteer at Southwark Day Centre for Asylum Seekers (SDCAS), a community that welcomes and supports refugees, migrants, and asylum seekers in Southwark. Right now, we’re facing the toughest moment in our nearly 30-year history. Unless we raise funds this September, we may not be able to keep offering the hot meals, English classes, advice, and safe community space that so many people rely on. That’s why I’m asking you to support our emergency Crowdfunder: 👉https://www.crowdfunder.co.uk/p/save-sdcas  Even a small donation, or sharing this with your friends and family, will make a huge difference in helping us to reach our £70,000 goal and keep SDCAS open. This place means so much to me, and to everyone who walks through our doors 💛.Thank you for your support in spreading the word.  ... Be sure to tag us @SouthwarkAsylum on Facebook and @sdcascommunity on Instagram We really value your support, £70K is an ambitious goal but we know our dedicated supporters can get us over the line! Our sincere thanks in advance from all of us at SDCAS. Best wishes Judith Arkwright"  
    • The address is: Bradbury Oak House, 4 Underhill Road, SE22 0AH
    • "2.2.1 The Royal National Institute of Blind People (RNIB) has undertaken a comprehensive consultation process with its residents and stakeholders regarding the proposed development which aims to create 41 additional units and has been designed to address the growing demand for accessible and supportive accommodation for individuals with visual impairments. 2.2.2 The consultation process has been a key part of the planning phase, ensuring that the needs and preferences of current residents are taken into account. RNIB has held several meetings, workshops, and surveys to gather feedback on the design, facilities, and overall impact of the new development. Residents have been encouraged to share their views on various aspects, including accessibility features, communal spaces, and the integration of the new blocks with the existing infrastructure which has directly informed the proposals. 2.2.3 The Applicant also engaged with the local MP, Helen Hayes, and a couple of local councillors at the behest of RNIB tenants to provide new homes to promote independent living for its Blind and Partially Sighted residents"     Seems like a very sensible and necessary proposal to me.
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...