Total gridlock this evening (wasn't great this morning), from Burger King/Lidl right back along Bellenden/Highshore/Lyndhurst in both directions because Bellenden is completely closed between Holly Grove (Ganapati corner) and Blenheim Grove due to railway bridge replacement. Sign says its going until early June. Avoid if you can.

I got caught up in it this morning. Absolute nightmare.


Took me an hour from B&Q Old Kent to East Dulwich.


Normally go through Pomroy St but got caught up on Nunhead lane closures last time so


thought I'd take Peckham Bellenden Rd option. Big mistake.



Foxy

This came out of nowhere to me (and to a lot of other people, apparently). No leaflets about it or anything. What's the plan for rerouting traffic while this happens? I didn't see any redirection signs anywhere, just lots of drivers stuck in endless queues and perplexed cyclists.

Took me 45 mins to get home from bushy hill road to oglander nightmare , traffic

Coming down lynhurst is being sent on a loop,

As you can't turn onto bellenden you get sent back onto Peckham road .

This is apparently for a month ( that prob means 2 months )Really bad planning :(

cosmonaut Wrote:

-------------------------------------------------------

> This came out of nowhere to me (and to a lot of

> other people, apparently). No leaflets about it or

> anything.


Nothing I can see on Southwark's website for road closures, and I haven't see any of the usual lamppost signs - perhaps it's an emergency?

I noticed a sign at the junction of Bellenden and Peckham Rd ,near Lidls ,last week .


But I'm guessing this wouldn't have been seen by people using Lyndhurst Grove /Lyndhurst Way to join Bellenden Rd further south by Ganapati .


So possibly poor signage rather than unplanned works ?


Certainly caused major problems on Peckham Rd .

A trip to Kings yesterday via what I assumed would be a easy stop off at Lidl Peckham, resulted in over 1 hour and 30 minutes in delays.


Best thing you can do if coming from Camberwell is to go back up Denmark Hill past the Fox on the Hill and then a left down towards the village. I feel sorry for people who live on the likes of Highshore RD who have no choice but to join the chaos to get out.


Louisa.

This is causing chaos.


I live near there and received notification about this but it was my understanding that the works were only going to be completed at night. They made mention to noise implications regarding this.


Currently the only diversion is for traffic to go back down Bellenden road by Lidl and through the traffic lights which only let about one car through at a time onto Peckham road. Obviously they can't go round to camberwell grove as that bridge is still closed. So there is currently a massive queue to get anywhere and peckham road is gridlocked.


I've just seen a car drive fairly agrresively the wrong way round the one way system and onto the blind corner of chadwick road.


Is there anything that can be done about this? It seems like particularly poor planning.

Yep, if this isn't due to an emergency it certainly is dreadful planning. Seems to me that you won't find out (at least without modern tech) that there's a closure until you become part of the related jams. Would've been good to get Camberwell Grove open before this started surely...?

These are works being done by Network Rail who have been responsible for organising the closure. The Rye Lane Councillors and Cabinet member have had several complaints and they have contacted officers who are liaising with Network Rail so that they find a less disruptive set up.

Renata

SpringTime Wrote:

-------------------------------------------------------

> Yep, if this isn't due to an emergency Would've been good to get

> Camberwell Grove open before this started

> surely...?

You'd think. We have been leafleted about tha Camberwell Grove work being done later in the summer. Why they couldn't have done that first before doing the work on Bellenden Road is beyond me. They have created a bottleneck with only one exit. The level of incompetence involved in the planning of this is quite staggering.

Of course !! Make life as difficult as possible and try and catch people out. Well done southwark council

They need to rearrange some one ways into two ways to make navigating that area possible. With the double whammy

Of camberwell grove shut the diversions are mind boggling. But i suspect that s half the satisfaction for the council.

This may be of interest, a reply received regarding the Bellenden Road Closure. People may know different.


RE: Bellenden Road Bridge Replacement

CR South East

Today, 16:01

You

Dear Mr Jones




Southwark Council has forwarded a number of complaints to Network Rail over recent days and the following message is designed to respond to those concerns raised with regard to the essential bridge replacement that is taking place on Bellenden Road, which is to replace a life expired bridge to allow the continuation of the train service in this area and to carry out improvement works to the Camberwell Grove bridge to open the bridge to traffic under 3 tonnes. Firstly, we would like to apologise for any inconvenience and disruption that these improvement works may be causing you. Network Rail and Southwark Council have been working closely together to try and mitigate and minimise as much disruption as possible, but due to the nature of the works there will regrettably be some disruption.




Network Rail and Southwark Council have to maintain their infrastructure for the safety of the public and to protect train passengers. However, due to limited railway closures to deliver both schemes as efficiently as possible we required the closure of all four railway lines for 72 hours. The May Spring bank holiday has given us the opportunity to carry out these essential works to both of the bridges. In the early stages of the project, an increase in traffic a certain times of the day is anticipated, however, this was compounded on Tuesday with a broken down vehicle on Peckham Road for a number of hours that reduced the road to a single lane.




Today, Thursday 10th May, Southwark Council and Network Rail have reviewed the signage on the diversion and taken into consideration the feedback from yourselves and have taken the steps to improve the signage where necessary , including placing traffic marshals at Bellenden Road at the junction of Holly Grove and Blenheim Grove at the junction of Bellenden Road, improving the signage at the junction Lyndhurst Way and Peckham Road. During a walkabout this morning, traffic was flowing well in the area.




We would like to take this opportunity to thank you for your patience and your kind co-operation during this time.




We will continue to monitor the situation.




Kind regards


Paula Williams


Network Rail

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • Honestly, the squirrels are not a problem now.  They only eat what has dropped.  The feeders I have are squirrel proof anyway from pre-cage times.  I have never seen rats in the garden, and even when I didn't have the cage.  I most certainly would have noticed them.  I do have a little family of mice which I have zero problem about.  If they stay outside, that's fine with me.  Plus, local cats keep that population down.  There are rats everywhere in London, there is plenty of food rubbish out in the street to keep them happy.  So, I guess you could fit extra bars to the cage if you wanted to, but then you run the risk of the birds not getting in.  They like to be able to fly in and out easily, which they do.   
    • Ahh, the old "it's only three days" chestnut.  I do hope you realise the big metal walls, stages, tents, toilets, lighting, sound equipment, refreshments, concessions etc don't just magically appear & disappear overnight? You know it all has to be transported in & erected, constructed? And that when stuff is constructed, like on a construction site, it's quite noisy & distracting? Banging, crashing, shouting, heavy plant moving around - beep beep beep reversing signals, engines revving - pneumatic tools? For 8 to 10 hours a day, every day? And that it tends to go on for two or three weeks before an event, and a week after when they take it all down again? I'm sure my boys' GCSE prep won't be affected by any of that, especially if we close the windows (before someone suggests that as a resolution). I'm sure it won't affect anyone at the Harris schools either, actually taking their exams with that background noise.
    • Thanks for the good discussion, this should be re-titled as a general thread about feeding the birds. @Penguin not really sure why you posted, most are aware that virtually all land in this country is managed, and has been for 100s of years, but there are many organisations, local and national government, that manage large areas of land that create appropriate habitats for British nature, including rewilding and reintroductions.  We can all do our bit even if this is not cutting your lawn, and certainly by not concreting over it.  (or plastic grass, urgh).   I have simply been stating that garden birds are semi domesticated, as perhaps the deer herds in Richmond Park, New Forest ponies, and even some foxes where we feed them.  Whoever it was who tried to get a cheap jibe in about Southwark and the Gala festival.  Why?  There is a whole thread on Gala for you to moan on.  Lots going on in Southwark https://www.southwark.gov.uk/culture-and-sport/parks-and-open-spaces/ecology-and-wildlife I've talked about green sqwaky things before, if it was legal I'd happily use an air riffle, and I don't eat meat.  And grey squirrels too where I am encourage to dispatch them. Once a small group of starlings also got into the garden I constructed my own cage using starling proof netting, it worked for a year although I had to make a gap for the great spotted woodpecker to get in.  The squirrels got at it in the summer but sqwaky things still haven't come back, starlings recently returned.  I have a large batch of rubbish suet pellets so will let them eat them before reordering and replacing the netting. Didn't find an appropriately sized cage, the gaps in the mesh have to be large enough for finches etc, and the commercial ones were £££ The issue with bird feeders isn't just dirty ones, and I try to keep mine clean, but that sick birds congregate in close proximity with healthy birds.  The cataclysmic obliteration of the greenfinch population was mainly due to dirty feeders and birds feeding close to each other.  
    • Another recommendation for Niko - fitted me in the next day, simple fix rather than trying to upsell and a nice guy as well. Will use again
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...