Lowlander Wrote:

-------------------------------------------------------

> Platform 15 - does anyone know when it will be

> widened?


I understood that it would only be once they'd finished the St Thomas St facade which, if you took a walk down there at all recently, looks a long way from completion.


----

Update: turns out if you ask nicely you sometimes get nice replies!


Hi @marke_se22, its narrow as we work on the facade of St Thomas Street and the concourse below, it will widen when that's finished mid-2016— Thameslink Programme (@TLProgramme) August 6, 2014


----


So there you have it - we're stuck with a narrow Platform 15 for the next two years...

MarkE Wrote:

-------------------------------------------------------

> Lowlander Wrote:

> --------------------------------------------------

> -----

> > Platform 15 - does anyone know when it will be

> > widened?

>

> I understood that it would only be once they'd

> finished the St Thomas St facade which, if you

> took a walk down there at all recently, looks a

> long way from completion.

>

> ----

> Update: turns out if you ask nicely you sometimes

> get nice replies!

>

> Hi @marke_se22, its narrow as we work on the

> facade of St Thomas Street and the concourse

> below, it will widen when that's finished

> mid-2016— Thameslink Programme

> (@TLProgramme) August 6, 2014

>

> ----

>

> So there you have it - we're stuck with a narrow

> Platform 15 for the next two years...


Thanks for finding that out and sharing - I'd just assumed it would be very short term! Oh well.

Alan Medic Wrote:

-------------------------------------------------------

> Can anyone advise if a monthly train ticket can be

> used on the buses during this period as the no. 40

> seems to be my best option?


Yes according to page below. But I would check.


https://www.tfl.gov.uk/travel-information/improvements-and-projects/london-bridge-rail-station/london-bridge-upgrade-travel-advice#on-this-page-2


We are working with the rail industry to help you get around during these disruptions. From Saturday 23 August to Sunday 31 August 2014, National Rail tickets will be accepted on any reasonable route on London Overground, First Capital Connect, Southern, Southeastern, South West Trains, London Underground, London Tramlink, DLR and London Buses.


For more information visit the Thameslink Programme website.

  • 2 weeks later...

Hi All


Does anyone know if our season tickets will be accepted on the underground? I'm assuming yes, but it's actually pretty difficult to find out for sure from all the info handed out and on the internet.


I normally walk from L.Bridge to Bank where my office is and have an annual rail ticket, so considering getting a train from Denmark Hill to Victoria and then the district/circle to Cannon St, but don't want to be stung for the extra underground fee.


Thanks

chesterpuss81 Wrote:

-------------------------------------------------------

> Hi All

>

> Does anyone know if our season tickets will be

> accepted on the underground? I'm assuming yes,

> but it's actually pretty difficult to find out for

> sure from all the info handed out and on the

> internet.


As per the reply from OutOfFocus at the end of the first page of this thread:


https://www.tfl.gov.uk/travel-information/improvements-and-projects/london-bridge-rail-station/london-bridge-upgrade-travel-advice#on-this-page-2


?From Saturday 23 August to Sunday 31 August 2014 National Rail tickets will be accepted on any reasonable route on London Overground, First Capital Connect, Southern, Southeastern, South West Trains, London Underground, London Tramlink, DLR and London Buses




> I normally walk from L.Bridge to Bank where my

> office is and have an annual rail ticket, so

> considering getting a train from Denmark Hill to

> Victoria and then the district/circle to Cannon

> St, but don't want to be stung for the extra

> underground fee.


I do a relatively similar journey and for the days when I'm coming in next week, I'm planning on coming in via City Thameslink. I used to take that option in the past quite a bit, particularly when the ED timetable wasn't as favourable as it currently it - it's perhaps 15 minutes walk from there to Bank but quite a nice one.

Thameslink with be rammed next week! Trains to the City/St Pancras leave Peckham Rye at 8.16, 8.36 and 8.41. Think there is an extra one at Denmark Hill around 8.20 which doesn't stop at Peckham which might be less busy. If the trains are a nightmare on Tuesday I'm going to get the bus in the rest of the week!

Fortunately they do tend to unload a large number of passengers at Denmark Hill, most of whom are heading to Kings, so there's usually some space at least.


In the past I've boarded at the tail end of the train on those 8.xx services and never had to squeeze on. It being August too should provide some small relief.


Would imagine, though, that the 40 will be horrific for anyone hoping to get on after NXR.

NXR to London Bridge is about 60 minute walk - good exercise


Or - walk to say, Camberwell and you'll hit a bunch of other routes headed into that part of town


I reckon buses won't be that bad anyway - at least if you leave a little earlier it's not a full train strike, and many other people will be travelling to other places

Those of you who use HOP or Brockley, there's a replacement bus service to Ladywell and Lewisham to connect with Southeastern and DLR services operating in the morning peak from 0630-0930.


London Overground are operating four additional trains per hour between Crystal Palace and Canada Water in the peaks, however Forest Hill station is expected to be very busy with a queuing system in place.

  • 2 weeks later...

Zebedee Tring Wrote:

-------------------------------------------------------

> Where is it stated anywhere online that LB won't

> be open on Monday? As far as I was aware, the

> closure was to end today (Sunday).


Nowhere that I could find but how many things finish on time is all I thought.

philosophie Wrote:

-------------------------------------------------------

> Thanks, Mark. Do we know if these timetable

> changes are permanent? Is the 8.40 going to

> terminate at south Bermondsey indefinitely?



Fixed until the next timetable update in (I think) the spring, or at least until the next mega change at Christmas (20th December to 4th January).

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • Another recommendation for Dulwich Test and Services Centre. Only been using them for a couple of years but wish I’d found them earlier 
    • A new roadmap (surely railmap?!) for rail accessibility has been published: https://www.gov.uk/government/publications/accessible-railways-roadmap It says "approximately 56% of stations and around 66% of the 1.3 billion journeys that take place on the network have step-free access to platforms...  "£373 million has been committed over the next 5 years to deliver Access for All projects, providing step-free access from station entrances to and between platforms, alongside other essential accessibility upgrades. These works, together, will increase the number of step-free stations across Great Britain from 56% to 58%. "This improvement will make travel easier with step-free access available at stations covering an increased share of total rail journeys – from 66% up to 71%" Don't know what that means for us here: upgrading Peckham Rye would cover a lot of rail journeys but the cost has no doubt increased from the £40m figure previously quoted. So that would eat into a lot of the funding.
    • It's not really though, is it. It's practical.  At least we're allowed Christmas lights.
    • We are the only specialist floor insulation company on the market to focus on insulating from below – meaning almost zero mess, disruption or noise! Warmdwell is extremely proud to receive the highest reviews for our professionalism, reliability, commitment and the all-round ease of doing business with us: we draw our team from professional, creative, educated backgrounds to provide a friendly, problem-solving team with the deepest integrity. We take real care of your home and aim to leave it as spotless as possible. Please check our Google Reviews to speak for us: "We were really pleased with their quote, communication, and with having the job done perfectly with almost zero disruption. We think they left the space cleaner than when they arrived, and we are definitely already getting the effects of a warmer room" – Miriam & Abed, Sevenoaks, Oct 2025 "Laurence and his team were extremely polite & helpful, and the work was performed over just 2 days with minimal disruption. It was absolutely the most relaxed work I have ever had performed on the house!" – Alistair, Cambridge, July 2025 "Extremely friendly, polite and efficient" – Diane, Forest Hill, June 2025 We are always keen to chat through your floor insulation options and provide as much free advice as we can, as well as free quotes and surveys – so why not ask us today about what is possible to protect your floors from the cold ventilation air blowing underneath, keep your heat in and warm up your home? We use high-performance mineral wool slabs, never foam, for so many reasons: it is the ideal flexible material for the irregularities of old floors; is breathable, working with the way your floor has successfully performed for perhaps 100 years or more; can easily be removed to access pipes and cables; and is completely non-combustible. A local business based in Crystal Palace, we work extensively around Dulwich, Herne Hill, Forest Hill, Lewisham, Tooting, Balham and across the south East of England. Please ask us about your floor insulation options or for local project case studies today! Phone Number: 02080792793 Email Address: [email protected] Website: https://warmdwell.co.uk/ View full listing
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...