This financial year Crystal Palace Road will be extensively renewed. This will be a painful protracted experience rebuilding the road including the pavement. This road was selected as being in the poorest condition in southern Southwark. Every year Southwakr officers make a formal assessment and we spent circa ?4->5M on road and lamp post maintenace. Effectiveyl a huge backlog of repairs going back 40 years which we can't fix overnight. It'll take a round 15-20 to catch up.


Hope that puts a little context. The resident on CPR should have received a letter from council officers.

As a CP Rd resident I welcome the refurb work, but a couple of points-


We received no notification about the work (nor did our neighbours). Even a sign put up in the road informing residents, and all those who use CP Rd as a rat-run, about the impending disruption would have been useful.


Then, yesterday morning a large stone slab in our front path (actually the threshold between our path and the pavement, but inside our front gate and on our property) lifted and cracked into several pieces when a JCB was ripping up the old tarmac pavement. These cracked pieces now wobble underfoot and as a result my four year old tripped over and fell when returning from nursery in the afternoon (no injury, but it could have been nasty). This morning on the way out I asked the workmen for the broken pieces to be made level and stable when they're laying the new paving slabs. They agreed at the time, but who knows? It'll be interesting to see what state my path and the pavement will be in when I return this evening.

  • 3 weeks later...

Hi Muley,

Sorry about no advance notice and explanation about the works.

Standard practice for Southwark Council is to deliver a letter telling everyone what is going on and why.

No explanation why wasn't produced for these extensive works.

I'm not sure if its worse now to deliver such a letter or not?

I did actually get a letter about the replacement of the pavement - there was also a number to call for any enquiries 020 8636 8822 taking you to Conway who are the contractors. I called them because my mains water has been lost under tarmac from previous work - they told me to go out and speak to the workmen when thye get my end of the street and ask them to ensure they make the water mains visible. When they do get round to re-commencing the work, I will pop out, offer them a cuppa and ask them to! It all sounds pretty good, I just hope the get round to doing the whole street.

Hi James, thanks for the response.


On your earlier posting you said that Southwark intend to rebuild CP Rd, including the pavement. If the road is to be resurfaced then a letter informing residents when the work is scheduled would still be very useful- there would be issues like parking and vehicle access to consider, as well as local traffic implications when the busy early morning CP Rd rat-run is closed off.


Husbandjim, it is worth having a word with the workmen when they get to you- I did, and they levelled and cemented the paving stone mentioned in my previous post, and even rebuilt our neighbours brick wall which fell down when the JCB pulled up the old tarmac.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • Sure, ChatGPT never ceases to amaze.
    • Chatgpt is a joy (and scary)  No Water on Barry Road" (to the tune of No Woman, No Cry) (Verse 1) No water… on Barry Road No water… on Barry Road Said, I remember, when we used to flow In the tap by the old front gate Oba served us clear, sweet water Then it vanished like fate And then the plumber would come in the evening Fixing pipes, sayin’, "Just hold tight" But every time we checked the faucet It was still a dusty fight (Chorus) No water… (no water) On Barry Road (on Barry Road) No water… yeah On Barry Road (Verse 2) I see the buckets lined up outside Hope in every pail we hold The sun be blazing, the kids be crying And the kettle’s running cold Good friends we had, and good friends we lost To the drought along the way In this bright future, we can't forget the past But we sure need water today (Chorus) No water… no flowin’ tide On Barry Road… we stand and sigh No water… but we still survive On Barry Road… we still try (Bridge) Oh, dry days will pass, I know Pipe dreams gotta start to flow But until then we wait and pray For rain or trucks to come our way (Final Chorus) No water… (no water) On Barry Road (on Barry Road) No water… no pride But still we rise… (It refused to sing it for me) 
    • Hubby had to retire from work due to serious ill health which had meant he was off work for several months at a time. His hospital consultant advised part time employment only, Signed on at Job Centre and asked them to send him on courses, especially IT has not computer literate or had a computer. Job Centre refused and insisted he applied for full time work even though he produced medical evidence from hospital and letter from previous employment detailing the reason why had medically retired him. He applied for the (then) disability allowance but was refused as not disabled enough and the fact he could work part time. Applied f or several part time jobs but when they knew of his medical history turned him down. That was 18 years ago. Disabled people who want  to work find it hard to find employment. I studied Disability and Employment in Holland as part of my degree and found at that time, the Dutch system more flexible. If a disabled person found a job part time, they still received a portion of their benefit as well as wages. If found a full time position, benefit suspended and were subject to regular reviews as to how they performed in  the job. If there were no problems, benefit was withdrawn, however if they found the work was not suited to their disability - they gave up work and went straight back to receiving their full benefit. If a disabled person finds employment, their benefits stop immediately. If they cannot maintain the work and are sacked, getting back onto benefits is very difficult, Give those who are able to work at least part time, the opportunity to have reduced benefits to top up wages.
    • Trickle of cold water this morning, but by 3 pm we have both hot and cold water with normal pressure, Hopefully this will continue.
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...