Jump to content

Recommended Posts

Who else can picture Mockney attempting to harness and quell the deep undertones of 'avin it large only to succumb to the rythme and start rebounding around the 8:17 from Denmark Hill to London bridge in a way that will only scare all the children on board.

Unlikely in current mood.


Here's a ditty that some may like, I'm thinking Jah will at any rate. My mate met them when he was standing in for the Get Cape Wear Cape Fly drummer at a festival In Budapest the other night (amazing what can come of a conversation about music with a stranger in a pub).


What if we'd never had punk (or something) by the King Blues


Http://songza.com/~nhgfio



and a little live solo in what looks like a record shop.

Http://songza.com/~mrucv8

  • 1 month later...

Sorry Jah, I just needed cheering up, that song usually does it for me.


These are much less twee, but probably more up Brendan's street thinking about it. They're also kind of of an ilk.


Condofucks*

Japandroids

Tokyo Police Club


*Yo La Tengo as a covers band.

  • 1 month later...
  • 2 weeks later...
  • 3 weeks later...
  • 3 months later...
  • 5 months later...
  • 10 months later...

I saw this late on C4 one night and thought it a really powerful version of a good song, possibly better than the original. I'd never heard of the band before and didn't even know who it was while I was watching but it will turn out to be a classic rock moment.


Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • You'd need to get a proper quote (or three) for instance removing a cast iron bath is a very different job from removing an acrylic one. Again what pipe work will be being joined into - matching old imperial pipes with modern metric ones is different from like to like, as is dealing with a copper or an iron distribution system. The amount (area) of retiling required is an issue, as will be the state of the wall behind the tiles. It may of course all be very plain sailing, or not. Have a first look at plumber recommendations on the relevant pages on this site. If it's all easy then 3 days work may be sufficient. But it could be a week if there are snags. 
    • Hi. Can anyone suggest a plumber for the job below? Replace bath tub with a shower enclosure, putting pipes to showerhead behind wall, re-titling damaged/removed tiles Also any idea of the costs involved for the labour as we will buy the items required?
    • Aria came round to fix my tub drain when I'd messed up the seal. Came within hours, fixed the tub, and ran a bath to make sure it was okay. Here's where the fun starts. While he was over, I asked him questions about the rest of the plumbing round the house. I had just moved into a Victorian home that was previously being rented. Unsurprisingly, we found another leak in the tub and a drip in the kitchen tap.  He came back the next day to put a better pipe in my bathtub and replace the kitchen sink. Painstakingly figured out how to replace the hard-to-access kitchen sink without cutting through the wood panel with the help of his builder friend, Mark. Answered all my questions and clearly knew his stuff. All this right before Christmas holidays! 
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...