Ladygooner Wrote:

-------------------------------------------------------

> The last direct train to East Dulwich runs at

> 17.50 tonight - After that it will be a nightmare

> - either going via Blackfriars or New Cross Gate

> changing 2 or 3 times to get to ED. Check out

> www.thetrainline.co


If National Rail is correct there aren't ANY direct trains to ED.

Alan Medic Wrote:

-------------------------------------------------------


> If National Rail is correct there aren't ANY

> direct trains to ED.


That's correct, as they're only operating out of four platforms for the rest of the day, the ED/PR trains are only operating to/from South Bermondsey.


Bar one train (1736 to West Croydon) you can travel to HOP and Forest Hill from London Bridge as normal during the evening peak or as I mentioned above, tickets are valid on the tube and Overground.

It is really handy of you sign up to tfl travel updates -they send you travel alerts about things like this in advance.

London Bridge National Rail station

From Friday 28 until Monday 31 March, there are changes to train services to and from London Bridge National Rail station while Network Rail carry out engineering works. There will be no Southern services to and from the station on Friday from approximately 10:00 until 11:30. There are also a number of timetable changes during the affected period. To plan your rail journey, please visit nationalrail.co.uk

AbDabs Wrote:

-------------------------------------------------------

> I think there is a 'small' amount of construction

> work going on at LB over this weekend. Monday

> morning won't be platform 13.


Platform 12 and 13 will be closed from now on as the new 14 and 15 open at the far end of the station.


It's also worth nothing that the cross platform footbridge will be shortened again with access between 1-10. For 11, 14 and 15, you'll need to walk up to the gateline and back along 8 or 9-10 to access it.

What a shambles Friday was, they had people all week giving out leafelts stating the reduced service adn providing the only trains times on Friday afternoon then during the day cancelled the ones that they said were running !!!


Another problem this morning meant I got the bus in, does anyone know of this was related to the weekend works and will the trains be runinng tonight ? No updates on National Rail site since this morning.

They said it was due to signal problems....but that is almost certainly a hangover from the weekend. Monday morning after weekend works is often a nightmare.


Worth checking before you set off home tonight.


New platforms some way further up the station as well. Need to factor in a good 30 seconds more for the dash from the tube plaforms past that TM Lewin and the South African biltong shop.

Cancellations announced for tonight on Southern, but nothing on the ED routes yet (http://www.southernrailway.com/southern/news/important-travel-advice-london-bridge-this-evening/).


Decided to defer the trip in by an hour this morning to allow the mess to settle but still got caught waiting outside LB for 30 minutes. Going to give it a miss and head home via Denmark Hill on the Thameslink and bus it to ED from there instead.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • In case anyone is renovating or stripping out an old kitchen, I am looking for a base kitchen unit or carcass to house an oven for a temporary set up kitchen.   Also looking for a run of worktop at least 180 cm long if anyone is disposing of something like this, I would be happy to collect.   thanks   Mila
    • Big recommendation for Stephen Viccary who has created a magnificent bathroom for us. Quality of work is absolutely top notch. We couldn't be happier - see pics.  Stephen is considerate and tidy meaning working from home during the work was fine (some noise - obviously, it is a demo and installation after all. He does not work on multiple jobs, does a full days work and does ALL the work himself - Tiling, plumbing, lighting (including lighting on a motion sensor under the vanity and in the shower niche - for night time visits 😉), he even changed the door architraves, sorted the badly cracked ceiling and did all the paint work. A full end to end service. Stephen's number - 07941 266 145
    • Highly recommend Dulwich Eco Gardening.  When he came to quote Saied said he’d give our garden back so we could decide what we do next.  Under two weeks of hard work from Saied and Mo and we have the garden back and can see paving I’d forgotten about. Not only did Saied remove our very overgrown greenery. Nature had taken over. He also took back to our fence line overgrown ivy, apple and pear trees and and dealt with a neighbours bamboo that had invaded our garden.  We are now going to get quotes for what we do next so those quoting will be able to see the space.  Saied has suggested someone to quote and will be coming back when he does in case he has any questions or they can work together.  I thought Saied would be a good choice and he was. Quotes from others didn’t leave me with confidence for the end result. That was never a concern with Saied.
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...