ed_pete Wrote:

-------------------------------------------------------

> I was going to say something similar. The lack of

> an interchange between the ginger line and Brixton

> tube seems ridiculous to say the least.


2 years ago they were considering it


http://www.lambeth.gov.uk/elections-and-council/about-lambeth/london-overground-stations-study-for-lambeth

Seems to be a feature of life in South London, the trains are rubbish and they aren't going to change...


The biggest investments in infrastructure (e.g. Thameslink program and Bakerloo line extension) aren't even adding new track, so they're just running more/better trains on existing lines. So many problems caused by tangled junctions and lines crossing over each other, overcomplicated routes all converging at a crowded terminus compared to the simple tube "there and back" type routes.


Not sure what it would take to build actual new track/tunnels linking new bits of South London but it would be hugely transformative...

The interchange to Charing Cross at London Bridge returns in August. When it opens, instead of walking to the gateline, there will be escalators, stairs and a lift mid platform which takes you to the new basement concourse which will take you to the new Charing Cross platforms which have been built where Platform 8 used to be.


This will be a major improvement on the old dank corridor and waiting area which would get crushed during the peaks.


However, there will be no direct service to Cannon Street for 18 months when this opens.

I am holding out for August now in the hope that all this disruption and chaos at London Bridge will have been worth it.


Does anyone know when our hopeless Thameslink services will be improved? Four trains per hour all day and evening trains would be a dream come true but I suspect that is also way too much to ask for.

James Wrote:

-------------------------------------------------------

> I am holding out for August now in the hope that

> all this disruption and chaos at London Bridge

> will have been worth it.

>

> Does anyone know when our hopeless Thameslink

> services will be improved? Four trains per hour

> all day and evening trains would be a dream come

> true but I suspect that is also way too much to

> ask for.


The problem with Thameslink is there's no room for improvement on the trains on the Wimbeldon loop. Thanks to the campaign where people campaigned for a through service, rather than terminating at Blackfrairs, there's no scope for TfL to replace the services with London Overground trains, nor for Thameslink to improve the service on either the Catford loop or Wimbledon/Sutton services.


When the Thameslink works finish, there will be plenty of trains at London Bridge, which will be much more than the old 4tph service, yet PR/DH and Nunhead, along with Herne Hill won't see any of the advantages bar a nice new train.


Those who use those poor 'local' TL trains may find it more viable to use Southern into London Bridge, then change for Thameslink for stations such as Blackfriars and St. Pancras instead from Dec 2018.

Jeremy Wrote:

-------------------------------------------------------

> If you need a direct link to the West End, moving

> to ED was a terrible decision!



Haha, but I love it here and will put up with it!


Nevertheless the need cannot be denied. Whether it be the Bakerloo line, the re-opening of Camberwell station or a Victoria-Overground link, a faster route directly north from here is badly needed.

Jeremy Wrote:

-------------------------------------------------------

> ED and Peckham are good for commuting to the city

> (putting the current temporary situation to one

> side). Other areas are good for the west end, but

> not so convenient for the city (e.g. Putney,

> Wandsworth). Just the way it is.

>

> You can't expect every area of London to have a

> direct link into the west end.


Perhaps not, but there's a huge gap in the network at the centre of which sits Walworth Rd. A no-brainer to fix.

Jeremy Wrote:

-------------------------------------------------------

> rahrahrah Wrote:

> --------------------------------------------------

> -----

> > In fact, I have suggested some secure bike

> parking

> > at Brixton and some more buses connecting to

> the

> > tube there. This seems pretty modest to me and

> > possibly more constructive than 'just move'.

>

> If that's aimed at me, you must have

> misunderstood.

>

> Someone else said that the lack of a direct west

> end link was the core problem. I disagree - and I

> repeat - it's not realistic to expect every area

> to have a direct link into the west end.



Perfectly reasonable when said area lies at the far end of a major northern route filled with bus traffic that heads into the West End. Also perfectly reasonable when people are clogging up eastern and western lines to avoid this route.

nxjen Wrote:

-------------------------------------------------------

> For those seeking a direct train line from ED to

> Charing Cross, I'm no engineer but there would be

> huge logistical problems. The line from ED joins

> the lines from Kent and other places in SE London

> at Southwark Park Road. ED trains get in at London

> Bridge at platform 14/15, the line that carries

> trains to Charing Cross from London Bridge

> commences at platform 6. So tracks would have to

> be built with points changes to bring trains from

> platform 14 to platform 6 on the length of track

> from Southwark Bridge Road to London Bridge.

> Possible I guess but it would affect the running

> of all trains from Kent, rest of SE London and ED

> line. Could only result in fewer trains all round

> and more delays.


Yup. There's a useful article on the topic here, which includes this diagram of the layout:

 

nxjen Wrote:

-------------------------------------------------------

> For those seeking a direct train line from ED to

> Charing Cross, I'm no engineer but there would be

> huge logistical problems.


I agree about this, but other links could be improved to better facilitate it. No reason a tube link to Camberwell wouldn't work if the will was there.

healey Wrote:

-------------------------------------------------------

> Jeremy Wrote:

> --------------------------------------------------

> -----

> > If you need a direct link to the West End,

> moving

> > to ED was a terrible decision!

>

>

> Haha, but I love it here and will put up with it!

>

>

> Nevertheless the need cannot be denied. Whether it

> be the Bakerloo line, the re-opening of Camberwell

> station or a Victoria-Overground link, a faster

> route directly north from here is badly needed.


I've totally lost interest in the Bakerloo extension :)


Camberwell + Walworth Rd need something.

Does anyone know when platform 15 at LB is due to go 'full width' again? The congestion caused by everyone slowly shuffling off the platform is a big part of the frustration when travelling in rush hour (also seems like it is something which could have been prioritised for resolution earlier in the works).

James Wrote:

-------------------------------------------------------

> Coming home from the theatre on Sunday I noticed

> there were only two trains per hour to Peckham

> Rye. I hope this is not an ongoing situation? When

> I first moved to East Dulwich there was a train to

> London Bridge every ten minutes on weekdays. Now

> there are only four per hour, badly spaced. What

> with no London Bridge-Charing Cross trains at the

> moment, my morning Thameslink service is overrun

> with people going to Elephant & Castle instead, to

> get straight onto the tube into the West End. The

> trains are often late and/or cancelled. The whole

> system is creaking under the strain, overcrowding

> is a daily occurrence... Does anyone know when any

> of this will get better? And why, while more and

> more people are using the trains from East Dulwich

> and Peckham, there seems to be no improvement

> whatsoever in frequency or capacity?


The short answer ? Very, very little. It's not just the rebuild of London Bridge, it's the shortage of drivers. So much so, they are cancelling services because there are not enough staff to drive them.


The lines you talk about are part of a mega franchise "Thameslink Southern Great Northern" that was recently awarded to Govia. Oh, you can write a letter of complaint that will get a form response to; you can refer the complaint to the well-meaning but toothless watchdog, London Travelwatch, who will write bon mots and report their dissatisfaction in their annual report, but actually lack any powers to do anything. You can write to your MP who will no doubt do the same.


The only people empowered to actually do anything are the shareholders of Govia and the Department for Transport. And, as the franchisee's performance is within what they consider to be acceptable limits, neither will do anything.


I hate to be the harbinger of doom, but it's going to get worse. "Thameslink Southern Great Northern" vastly overbid for the franchise and are now looking to cut costs. This will be done in part by keeping driver staff to the bare minimum, and also by destaffing huge swathes of their stations, where there will only be people selling tickets from 6.30am to 11am. Outside of this, there will (probably) be someone checking tickets, showing people how to use the ticket machines and answering queries.


Your sole hope to have them stripped of the franchise would be to find any element of financial impropriety in the parent company (which is why Connex were stripped of the franchise).

Well thank goodness we pay such excellent value fares to compensate for the dreadful service. And thank goodness, since the train companies are drawing profits, we are not subsidising them from our taxes too.


Hold on a minute... what's that you're saying?

rahrahrah Wrote:

-------------------------------------------------------

> Does anyone know when platform 15 at LB is due to

> go 'full width' again? The congestion caused by

> everyone slowly shuffling off the platform is a

> big part of the frustration when travelling in

> rush hour (also seems like it is something which

> could have been prioritised for resolution earlier

> in the works).


I'd assume when the Charing Cross platforms open as part of the blockade is where the stairs/escalators/lifts are to the basement concourse. Platforms 10-14 also have parts blocked off for this reason.

Bic Basher Wrote:

-------------------------------------------------------

> rahrahrah Wrote:

> --------------------------------------------------

> -----

> > Does anyone know when platform 15 at LB is due

> to

> > go 'full width' again? The congestion caused by

> > everyone slowly shuffling off the platform is a

> > big part of the frustration when travelling in

> > rush hour (also seems like it is something

> which

> > could have been prioritised for resolution

> earlier

> > in the works).

>

> I'd assume when the Charing Cross platforms open

> as part of the blockade is where the

> stairs/escalators/lifts are to the basement

> concourse. Platforms 10-14 also have parts

> blocked off for this reason.


Scheduled be August as per Bic Basher's comments.

This is a very informative thread. Thanks to all contributors.


One comment on the non-viability of a direct ED/PR connection to the West End - I'm sure someone in the know once told me a branchline could be reopened somewhere between the Elephant & Castle/Blackfriars and Charing Cross at relatively low cost. Perhaps capacity problems at CX prevent this.

Currently on train now, it's rammed and we're not yet at Queens Road. I remember living there and the nightmare it was getting on an already packed train and that was ten years ago...


one solution is to clear out the seats in a carriage? There are 8 ppl sitting down which could easily fit 20.

uncleglen Wrote:

-------------------------------------------------------

> Of course everything is going to get worse as more

> people pile into the capital...

Don't worry, Brexit is going to fix the problem of East Dulwich workers wanting to commute into the City for work :(


"I've totally lost interest in the Bakerloo extension "

Why? A regular bus to a Bakerloo station on OKR would solve a lot of problems and would be easy-ish to introduce.

rabbitears Wrote:

-------------------------------------------------------

> uncleglen Wrote:

> --------------------------------------------------

> -----

> > Of course everything is going to get worse as

> more

> > people pile into the capital...

> Don't worry, Brexit is going to fix the problem of

> East Dulwich workers wanting to commute into the

> City for work :(

>

> "I've totally lost interest in the Bakerloo

> extension "

> Why? A regular bus to a Bakerloo station on OKR

> would solve a lot of problems and would be

> easy-ish to introduce.


I don't know - maybe after the retirement changes I'll be interested again :)

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • on a practical level found here these have very positive feedback:   Danny - 07943 673482 joeast 12/09/23 Just had my roof replaced by Danny (mobile 07943 673482) who I would highly recommend. He is honest, clean, reliable and explained the work and sent photos as the work progressed. His initial estimate for costs was detailed and close to the actual price of the job. jamondo 07/12/24 Another recommendation for Danny here!  After carrying out extensive work on our property in 2018, we have constantly had problems  with the newly built roof.  Then followed numerous fixes and bodges by the builders then by other so called 'experts' and professionals' charging extortionate amounts and / or giving guarantees that amounted to nothing.  Lots of 'it could be this and that etc...'  Sadly our tale of woe is not uncommon. After getting a number of people to look at the roof - the consensus was that the whole roof needed redoing (it was clear that by now the roof looked a mess with multiple things done wrong or poorly).  We obtained quotes and decided to go with Danny - his was the most competitive but it was not overriding factor behind why we did.  Danny made clear what the quote covered and where there might be extra work required as he got to it (this was fairly minor). He was easy to get a hold of and responded promptly and he was also happy to offer up refences which I did contact and all were happy to vouch for him. Minor downside was that we had a bit of a wait, but it was worth it.  When work started I was kept updated with progress and photos.  Issues were dealt with, and although I'm not an expert by any means the appearance of the work was top.  Most importantly we are leak free! bonzo 17/05/25 Needed a new rear roof for terrace house in East Dulwich and heard about Danny Denton (07943 673482). Have worked with over 20 builders in the past but this guy was way the best - polite, hard working, honest, professional, informative, highly skilled and above all quoted lower than any of the others who came down to view the job. If you need roofing work I would definitely give him a call. If he's busy working else where I assure you he is well worth waiting for. He got the scaffold up and job finished in no time and kept me informed at every stage. Another roofer (who appears on this forum) gave a quote which was three times higher than Danny's.   #########################################################   Norwood Roofing 07412 000 214 Email Address: [email protected] Website: https://norwoodroofing.co.uk/ Fee163 01/01/26 Another 5 star recommendation for David and Patrick. Got in touch with David last week regarding clearing our gutters and as always he quoted immediately and came out within the week to do the job.  We've used David and Patrick for all our roof work for almost 10 years .   They also did an amazing job for my sister who is based outside the area - she couldn't easily find someone local and they stepped in and did a fantastic job (it was quite a big job).  Can't recommend them highly enough, really personable, always reliable and so easy to work with and consistent, just wouldn't work with anyone one else!  Thanks again David and Patrick. caroline5553 12/01/26 Another recommendation for David and Patrick. David came out the same day we called, had scaffolding up by the weekend and the job done on Monday. Really nice guys, never made me feel uncomfortable, easy to work with and seemed to have done a great job. Thanks, David and Patrick! sheppick 15/12/25 I would also recommend David and Patrick. David quoted immediately, and they came and did the work I needed the following week. They fixed my leaking roof and did a number of other jobs for me that were needed on the roof. Really reliable, turned up on time and very reasonable quote. Super easy to deal with and I would highly recommend.  #################################################################   Which Trusted Trader R Tredget & Son 07905829393 or 07956553852  [email protected] http://www.rtredgetandson.com/ OUR FEATURED WORKS Roofing, plumbing, kitchen installation, building, interior decorating, electrical installation, bathroom installation, exterior decorating, tiling, plastering, landscaping & carpentry 02/08/25 This is the second time R. Tredget & Son have carried out works on our property. Part of the work included the repair of cladding on an end gable that Richard had previously installed but it had since been accidentally damaged by another trades-person. I assumed I'd pay for such repair work, as the damage was no fault of his own, but when we discussed this, Richard was adamant he would not charge! Made a lovely job of the repair too. When you turn your home (or part of it) over to builders it often feels like they've taken over. Not so with Richard, Adam and Harrison. They respect your property and are willing to work with you. They keep you informed at every stage, offering suggestions and alternatives as appropriate and they don't take liberties. We are so glad to have found R. Tredget & Son builders: quality work from reliable, hard-working and courteous folks. 10/10/24 Multiple jobs complete to a high standard We've used Richard for a few years now getting our house complete. He and his team have completely refitted our kitchen, replaced ceilings, built internal and external walls, laid flooring, plastered, decorated, fixed guttering, fit skirting boards; the list goes on! They take pride in their work, and every job we've needed doing, they've always done to a high standard. No job was too big or too small for them, and I've no doubt the quality work they've done has increased the value of our house, so a big thanks again for everything they've done. 17/04/24 A Great Family Run Company This was our first time having works done in a new house so we were understandably nervous! From the first meeting with Richard and Adam we knew that we would be in good hands. Nothing that we wanted done was too much of an issue, even if it was a bit more of a challenge to them (unlike some other quotes we got!). They gave clever suggestions but weren't pushy with it and had good ideas! We had a whole new bathroom installed and then some structural work done around the house. The guys always made sure that they left the house in a clean state at the end of every day, which really made a difference to our standard of living during the works. Richard, Michelle, Adam, and H were trustworthy and communication was perfect throughout. We used some of their guys for boiler/electrics too and they were also great. Would highly recommend taking them on for your works!       
    • Bit of a long-shot, but I dropped my glasses somewhere along my run last night, after taking them off due to the rain. The glasses are Giorgio Armani with grey frames. My running route attached, so they could be anywhere along this route. If you've found them, please get in touch! 07971806292 Many thanks James
    • I'm in the middle of the civil service pension crisis with no pension for 4 months and counting. No access to the much publicised loans either. I have emailed Helen Hayes several times. It took her 6 weeks to contact Capita on my behalf but no follow up, no reply, she didn't attend the Westminster Hall debate about the issue either. Lots of other MPs are speaking and acting on behalf of their constituents but I've had no joy. Has anyone else please? What works to get help from Helen Hayes?
    • Our cat Suki has gone missing from Keston Road near Goose Green. Please let us know if you see her anywhere or can check your sheds and gardens. You can contact us me on 07980308743 or [email protected].  Thanks Chris
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...