Jump to content

New entrance to Denmark Hill station


Recommended Posts

I know some of my fellow east dulwich-ites commute via Denmark hill station - what do you make of the new entrance? It's not improved much in my opinion - you can now walk down to the platforms using two dofferent routes but the foyer and outside the entrance is a mess. There is no clear in or out so people just pile in, there is only one oyster machine and the queuing space for that is not big enough and people in the queue obscure the departure boards. There's no cash machine anymore either. Then there's the space outside the station - the pavement is narrow and gets blocked up with people - especially smokers- who get in the way. It's chaos!
Link to comment
Share on other sites

Having used it a few weeks, the main hassle I experience us the single small departures screen.

If I stop to look at it before going through barriers I'm blocking other people who're trying to get to the barriers, if I try and look after going through the barriers I'm blocking those trying to exit the barriers, so I have to do a fast-track glance as I pass through - which is foiled if the page on the screen has not refreshed to the train I want to check.

I think there should be another screen, perhaps after the barriers.

The pavement outside is not narrow at all, it's wide - however it does get congested with smokers and people waiting to meet others.

I hope the cafe manages to keep going but fear they'll be by-passed unless there's decent signage deployed.

Link to comment
Share on other sites

What about some railings directly outside the entrance - people can easily spill out into the road?


I think the pavement is too narrow during busy times, usually you have a station entrance set back a bit from a road to allow people to loiter and wait. It seems very little thought has gone into how people use the station.

Link to comment
Share on other sites

I have to agree with you all. It's so poorly designed. I hope the 'architects' are hanging their heads in shame.

An appalling use of public money to produce a confused sub standard design which for most users has resulted in a reduction in utility.


I suspect the excuse would be protecting the listed components of the buildings. But the additions are so poorly conceived that they've significantly detracted from the listed building.

Link to comment
Share on other sites

edhistory Wrote:

-------------------------------------------------------

> Without bad design, bad commissioning, bad project

> management, and bad implementation there would be

> no remedial contracts.

>

> John K


xxxxxxx


How cynical! But I'm sure you're right.

Link to comment
Share on other sites

I don't use the station but I pass by and it's ugly. As a non-user I guess I had been thinking "oh well it's ugly but at least it's serving a purpose". Apparently not even. How sad to make a building ugly without achieving anything for the users.
Link to comment
Share on other sites

About a month ago I asked what was going on with the lifts and I was told that they have 'electricity issues' and that they can't be connected to the mains and that they should be working in the near future. I read that as 'We have run out of money and we don't know when they will be working, if they ever do'.
Link to comment
Share on other sites

Coffee place is not there any more, the whole of the old ticket hall is having work done on it. Not sure what.


Overall, I'm not a fan. It's good to have two sets of staircases, but that's it.


One Oyster machine is intensely annoying.

No cash machine, or cafe/kiosk.

Exit in the wrong place - if the old one reopens, they're basically the same thing. One further west, and one on the Maudsley side (as there is some activity there) would help spread people out. And lessen the walk for those coming from Champion/DK Hill/C Grove.

A short path could easily connect to the deck where the lifts are.

Gates always open anyway so hardly being monitored. Screens tiny and if you stop to look at them, you're in everyone's way.


Terrible design overall. And it's an increasingly busy/important station - why has it been so shite?

The West Hampstead Thameslink rebuild was a huge success and is a similar layout of station. Looks reasonable too. Was this not done as part of the Thameslink project maybe?

Link to comment
Share on other sites

RosieH Wrote:

-------------------------------------------------------

> Are there any plans for a second entrance on

> Windsor Walk does anyone know? Was trying to work

> out what the activity on that side was today.



That would make some sense. I remember when they had a temporary entrance there a couple of winters ago. We need multiple exits around the station's site. I am interested to see what they are going to do with the old ticket hall - currently being refurbished. Hopefully it will reopen and be another option but might not be an exit as there isn't really a space for ticket barriers. If the Phoenix bar was not there, then the station might be more spacious. You could have spill out where the outside of the bar currently is. However, am I right in saying that historically there was once a brewery and pub on the station's site and this burnt down, and hence The Phoenix was built sans the brewery. Can't argue with history...

Link to comment
Share on other sites

Totally agree that it's an awful waste of money due to the poor design. This morning they had alternate in and out Oyster gates, so people get caught up with each other coming in and out (better to have the out ones together and the in ones together to improve the flow).


I'd like to know what is happening with the old entrance. If there was any way that could be made exit only and the new one entrance only it would work much better in terms of flow through the station.

Link to comment
Share on other sites

cle Wrote:

-------------------------------------------------------

> Exit in the wrong place - if the old one reopens,

> they're basically the same thing. One further

> west, and one on the Maudsley side (as there is

> some activity there) would help spread people out.

> And lessen the walk for those coming from

> Champion/DK Hill/C Grove.

> A short path could easily connect to the deck

> where the lifts are.


I agree and this is what has bewildered me about the project. Looking at the design as it stands it is obvious that a second exit, accessible by steps, should have been created in the area you describe. And indeed, it wouldn't have been difficult to factor this is to the initial design and building phase. The problem with the new way of accessing the platforms is that from the current entrance it is still a much longer way of getting to the platforms. Whereas with the second entrance we are discussing, it would have been the natural entry point from anyone coming from Champions Hill which would have streamlined the new station layout at a very minimal extra cost.


Plus the whole new part of the station looks pretty ugly. Did they run out of money for a coat of paint on the horrible greyness of it all?

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • Something doesn't quite smell right here and probably it's not  the chicken. Both the OP and TheWeekEnd specifically mention  chicken thigh fillets. TWE purchased £14 worth of chicken thigh fillets and they were thrown away "probably for the third time". £14 equates to around 12 fillets which is a lot. Could some have been frozen after purchase and then thawed? And thawed properly before cooking? TWE has a total of 4 posts of which 3 are on this thread.  
    • Thanks to all for the advice, very glad to have this community for these enquiries. Here is how it got resolved in case its useful for anyone in the future: I had ordered some garden waste bags, and when the Veolia person came around I just asked them, and they were more than happy to take it no questions asked. 🙂 
    • I keep seeing a thread 'missing cat', but you've been found.  Not sure if all would consider that a good thing.  Not a lot new happening ....  When you back in Blighty?
    • In March Oli and his team did an excellent job of the following work at a property I manage.  1. Completely removing existing broken front path. Covering and securing the void (coal shute) beneath using concrete lintels, waterproof membrane and concrete. Laying a compacted sub-base and new clay pavers. 2. Removing broken fence. Securely installing 6 fence posts and 5 fence panels across the end of the back garden. Base of posts wrapped in plastic  sheath and set in post mix. 3. Removing broken render from terrace steps and cleaning then re-rendering steps where needed and repairing other parts.  4. Jet washing rear patio. I would like to thoroughly recommend him to you for a job done very well at a fair price.  
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...