Apologies if anyone has already posted about this - I couldn't see anything.


The bridge on Camberwell Grove has been closed and will remain closed to all vehicle traffic for at least 6 months. The Council hopes to have it open for 2-way cycle traffic by Friday.




The roadworks on Lyndhurst Way have been suspended as the combination of the bridge closure and roadworks have left the area around Lyndhurst Grove and Lyndhurst Way virtually gridlocked at times.


Avoid the area if possible.


GM99

Also at the bottom of Chadwick Road where it joins Lyndhurst Way, Southwark has allowed construction work to build houses entailing built storage structures into the road which has closed off half the road and 50 ft of pavement which is causing traffic build up. All it takes is one large lorry and that is it.
Not surprising given that many trucks try and squeeze over it on fairly regular basis so the bridge is probably failing. It would not surprise me if the six months turns into a permanent closure. A boon to the residents of Camberwell Grove, but a massive pain for anyone living around Bellenden - which was chaos last night thanks to the through traffic being rerouted down and along Lyndhust, then up via Bellenden, Maxted, Adys etc, rather than up the Grove and then Dog Kennel Hill.

If one can go back a few years the residents of Camberwell Grove tried to get the bridge closed but fortunately a mass turnout of residents at a meeting in the chapel on the Grove put a stop to this.


British Rail at that meeting promised to reinstate a new bridge as the old one could not handle the weight of large vehicles, hence the measures there now, and the measure that is now there was only temporary.


No doubt Camberwell Grove residents will again be working behind the scenes to make your fears come true. The main reason they offered up was it was a rat run. At that meeting it was rather like the film independence Day. One day it was all quiet and not a vehicle in sight, they all went to bed and the next day traffic that did not exist before they bought suddenly appeared.


Camberwell Grove has alway been a major highway from the moment it was built and should continue as such. This reason was excepted 100% by all parties concerned. The side roads cannot handle the traffic.


Has anyone actually seen any official reasons and data to support the current closure?


With Southwark Road plans these days one has to be very vigilante as things just get passed on a TMO.

I remember that meeting well. The Camberwell Grove residents played a dirty but skilful game then and they'll do so again no doubt. They are a powerful, well organised and resourceful bunch. But were defeated ultimately by residents of Lyndhurst Grove and the toast rack roads.

We used to live on CG (at the top end) and when the bridge was completely closed for all that time it was a huge pain. When it reopened with the road narrowing necessitated by the weak bridge, it was perfect. Access both ways but prevention of oversized vehicles using the Grove. There's no room for passing for large vehicles in several places, so opening it with no width restrictions would be horrendous.


Now it's closed again and we live in Camberwell (below the bridge), it's horrendous again.


They need to strengthen the bridge, open the rod and maintain a width restriction.

As is with the road restriction is perfect. Unfortunately common sense always seems lacking when they have their own agendas.


Yesterday walking through Grove Park via Chadwick Road the traffic was horrendous and having the refuse collection taking place traffic came to a standstill till they reached the bottom.

DuncanW Wrote:

-------------------------------------------------------

> Now it's closed again and we live in Camberwell

> (below the bridge), it's horrendous again.

>

> EdCam - are you a troll?


Ha! Not literally "below" I hasten to add. Although if you're a goat, watch yourself around these parts. I live between CG and what the estate agents nauseatingly call "the toast rack". About where you'd put the marmalade.


Yup - Lyndhurst Grove/Chadwick etc. is awful because of this.

as a toast rack resident, I can confirm that traffic is absolutely awful right now with this closure. Fingers crossed thpugh that this helps spur residents on to vote for a CPZ. As the consultation closes next week, I hope thos happens, as it will help quieten down the wider roads anyway without the heavy traffic looking for spaces and to get past the .
  • 3 weeks later...

The introduction of restricted parking on Lyndhurst/Shenley etc will not really help. All the residents living 'below' the road closure have to do a massive tour to get to Sainsbury's or Herne Hill.


I have a feeling this 'temporary' closure of the bridge will turn in to a permanent one just like the one at DKH station, there just doesn't seem to be the will nor money to actually maintain/repair these bridges.

As people have pointed out at the last meeting held regarding this bridge, British Rail, Southwark etc all agreed that it would be replaced.


If people can remember it was at the same time as the Borough had its new bridge swung in.


It was mentioned that this could be done.


Agree residents on Camberwell Grove will do all they can to stop the Grove opening. Their last wheeze was having a Toll gate like Dulwich. It was laughed out of court.

Stopping Cyclists riding over looks very unnecessary.

But then all these Southwark road works are managed and supervised by "specialists" who's main objective is to cause as much unnecessary disruption as possible, for as long as possible and to be as expensive as possible.

Brown paper envelopes system must oil the way. ;)

Anyone remember Peckham Rye and the unnecessary diversion and road works that aided the death of that young girl ... as dangerous as possible too ..

fortunately and hopefully extra fatalities don't look like they've been built into this (mole hill to mountain) project.


Seriously it could be replaced in a couple of months in almost any other country couldn't it?

I will never forget the little girl who needlessly died at the lights by peckham rye. My daughter was the same age and a mum from school lay with her whilst she passed away.

It haunted us all for a long time and is still upsetting. A tragic waste of life because although the work had finished the workmen hadn't removed the temp lights.

jimlad48 Wrote:

-------------------------------------------------------

> as a toast rack resident, I can confirm that

> traffic is absolutely awful right now with this

> closure. Fingers crossed thpugh that this helps

> spur residents on to vote for a CPZ. As the

> consultation closes next week, I hope thos

> happens, as it will help quieten down the wider

> roads anyway without the heavy traffic looking for

> spaces and to get past the .


You're very much deluded if you think CPZ will help in any way around the area... really think about it and be careful what you wish for - once it's in...*shrugs

I lived in Camberwell, north of the bridge when it was closed (due to structural issues). It was a nightmare. Network Rail promised that they would reopen it and as a temporary measure it was reduced to one lane. The same has now happened on Windsor Walk. Regardless of whether or not one thinks that reducing traffic to a single lane, or closing access to a road entirely is a good idea or not, this is not how such decisions should be made. I wonder how many crossings need to close before the people charged with their maintenance are actually held to account.
we live off the upper end of Camberwell Grove. Closure of the bridge means that I can't shop in Camberwell en route into town as it takes so long to drive round. I was told yesterday by a neighbour that the closure will be for five years! how long does it take to rebuild one tiny bridge?

Last Thursday a lorry came up Chadwick Road and could not move because of the traffic from Camberwell Grove. Chadwick Road was shut for approx 40 minutes.


The lorry had to reverse the whole length of the road from the railway bridge.


Jams are now the norm on the road.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • Per Cllr McAsh, as quoted above: “We are currently updating our Enforcement Policy and changes will allow for the issuing of civil penalties ranging from £175 to £300 for visible smoke emissions, replacing the previous reliance on criminal prosecution. " Is anyone au fait with the Clean Air Act 1993, and  particularly with the state of 'Smoke Control' law and practice generally?  I've just been looking  through some of it for the first time and, afaics, the civil penalties mentioned  were introduced into the Clean Air Act, at Schedule 1A, in May 2022.  So it seems that, in this particular,  it's a matter of the enforcement policy trailing well behind the legislation.  I'm not criticising that at all, but am curious.  
    • Here's the part of march46's linked-to Southwark News article pertaining to Southwark Council. "Southwark Council were also contacted for a response. "Councillor James McAsh, Cabinet Member for Clean Air, Streets & Waste said: “One of Southwark’s key priorities is to create a healthy environment for our residents. “To achieve this we closely monitor legislation and measures that influence air pollution – our entire borough apart from inland waterways is designated as a Smoke Control Area, and we also offer substantial provision for electric vehicles to promote alternative fuel travel options and our Streets for People strategy. “We as a council support the work of Mums for Lungs and recognise the health and environmental impacts of domestic solid fuel burning, particularly from wood-burning appliances. “We are currently updating our Enforcement Policy and changes will allow for the issuing of civil penalties ranging from £175 to £300 for visible smoke emissions, replacing the previous reliance on criminal prosecution.  “This work is being undertaken in collaboration with other London boroughs as part of the pan-London Wood Burning Project, which aims to harmonise enforcement approaches and share best practice across the capital.” ETA: And here's a post I made a few years ago, with tangential relevance.  https://www.eastdulwichforum.co.uk/topic/278140-early-morning-drone-flying/?do=findComment&comment=1493274  
    • The solicitor is also the Executor. Big mistake, but my Aunt was very old, and this was the Covid years and shortly after so impossible to intervene and get a couple of close relatives to do this.  She had no children so this is the nephews and nieces. He is a single practitioner, and most at his age would have long since retired - there is a question over his competence Two letters have already gone essentially complaining - batted off and 'amusingly' one put the blame on us. There are five on our side, all speaking to each other, and ideally would work as a single point of contact.  But he has said that this is not allowed - we've all given approval to act on each others behalf. There are five on her late husband's side, who have not engaged with us despite the suggestion to work as a team, There is one other, who get's the lion's share, the typicical 'friend', but we are long since challenging the will. I would like to put another complaint together that he has not used modern collective communication (I expect that he is incapable) which had seriously delayed the execution of the will.   I know many in their 80s very adept with smart phones so that is not an ageist comment. The house has deteriorated very badly, with cold, damp and a serious leak.  PM me if you want to see the dreadful condition that it is now in. I would also question why if the five of us are happy to work together why all of us need to confirm in writing.             The house was lived in until Feb 23, and has been allowed to get like this.
    • Isn’t a five yearly electricity safety certificate one of the things the landlord must give for a legal tenancy?
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...