Jump to content

Recommended Posts

Apologies if anyone has already posted about this - I couldn't see anything.


The bridge on Camberwell Grove has been closed and will remain closed to all vehicle traffic for at least 6 months. The Council hopes to have it open for 2-way cycle traffic by Friday.




The roadworks on Lyndhurst Way have been suspended as the combination of the bridge closure and roadworks have left the area around Lyndhurst Grove and Lyndhurst Way virtually gridlocked at times.


Avoid the area if possible.


GM99

Also at the bottom of Chadwick Road where it joins Lyndhurst Way, Southwark has allowed construction work to build houses entailing built storage structures into the road which has closed off half the road and 50 ft of pavement which is causing traffic build up. All it takes is one large lorry and that is it.
Not surprising given that many trucks try and squeeze over it on fairly regular basis so the bridge is probably failing. It would not surprise me if the six months turns into a permanent closure. A boon to the residents of Camberwell Grove, but a massive pain for anyone living around Bellenden - which was chaos last night thanks to the through traffic being rerouted down and along Lyndhust, then up via Bellenden, Maxted, Adys etc, rather than up the Grove and then Dog Kennel Hill.

If one can go back a few years the residents of Camberwell Grove tried to get the bridge closed but fortunately a mass turnout of residents at a meeting in the chapel on the Grove put a stop to this.


British Rail at that meeting promised to reinstate a new bridge as the old one could not handle the weight of large vehicles, hence the measures there now, and the measure that is now there was only temporary.


No doubt Camberwell Grove residents will again be working behind the scenes to make your fears come true. The main reason they offered up was it was a rat run. At that meeting it was rather like the film independence Day. One day it was all quiet and not a vehicle in sight, they all went to bed and the next day traffic that did not exist before they bought suddenly appeared.


Camberwell Grove has alway been a major highway from the moment it was built and should continue as such. This reason was excepted 100% by all parties concerned. The side roads cannot handle the traffic.


Has anyone actually seen any official reasons and data to support the current closure?


With Southwark Road plans these days one has to be very vigilante as things just get passed on a TMO.

I remember that meeting well. The Camberwell Grove residents played a dirty but skilful game then and they'll do so again no doubt. They are a powerful, well organised and resourceful bunch. But were defeated ultimately by residents of Lyndhurst Grove and the toast rack roads.

We used to live on CG (at the top end) and when the bridge was completely closed for all that time it was a huge pain. When it reopened with the road narrowing necessitated by the weak bridge, it was perfect. Access both ways but prevention of oversized vehicles using the Grove. There's no room for passing for large vehicles in several places, so opening it with no width restrictions would be horrendous.


Now it's closed again and we live in Camberwell (below the bridge), it's horrendous again.


They need to strengthen the bridge, open the rod and maintain a width restriction.

As is with the road restriction is perfect. Unfortunately common sense always seems lacking when they have their own agendas.


Yesterday walking through Grove Park via Chadwick Road the traffic was horrendous and having the refuse collection taking place traffic came to a standstill till they reached the bottom.

DuncanW Wrote:

-------------------------------------------------------

> Now it's closed again and we live in Camberwell

> (below the bridge), it's horrendous again.

>

> EdCam - are you a troll?


Ha! Not literally "below" I hasten to add. Although if you're a goat, watch yourself around these parts. I live between CG and what the estate agents nauseatingly call "the toast rack". About where you'd put the marmalade.


Yup - Lyndhurst Grove/Chadwick etc. is awful because of this.

as a toast rack resident, I can confirm that traffic is absolutely awful right now with this closure. Fingers crossed thpugh that this helps spur residents on to vote for a CPZ. As the consultation closes next week, I hope thos happens, as it will help quieten down the wider roads anyway without the heavy traffic looking for spaces and to get past the .
  • 3 weeks later...

The introduction of restricted parking on Lyndhurst/Shenley etc will not really help. All the residents living 'below' the road closure have to do a massive tour to get to Sainsbury's or Herne Hill.


I have a feeling this 'temporary' closure of the bridge will turn in to a permanent one just like the one at DKH station, there just doesn't seem to be the will nor money to actually maintain/repair these bridges.

As people have pointed out at the last meeting held regarding this bridge, British Rail, Southwark etc all agreed that it would be replaced.


If people can remember it was at the same time as the Borough had its new bridge swung in.


It was mentioned that this could be done.


Agree residents on Camberwell Grove will do all they can to stop the Grove opening. Their last wheeze was having a Toll gate like Dulwich. It was laughed out of court.

Stopping Cyclists riding over looks very unnecessary.

But then all these Southwark road works are managed and supervised by "specialists" who's main objective is to cause as much unnecessary disruption as possible, for as long as possible and to be as expensive as possible.

Brown paper envelopes system must oil the way. ;)

Anyone remember Peckham Rye and the unnecessary diversion and road works that aided the death of that young girl ... as dangerous as possible too ..

fortunately and hopefully extra fatalities don't look like they've been built into this (mole hill to mountain) project.


Seriously it could be replaced in a couple of months in almost any other country couldn't it?

I will never forget the little girl who needlessly died at the lights by peckham rye. My daughter was the same age and a mum from school lay with her whilst she passed away.

It haunted us all for a long time and is still upsetting. A tragic waste of life because although the work had finished the workmen hadn't removed the temp lights.

jimlad48 Wrote:

-------------------------------------------------------

> as a toast rack resident, I can confirm that

> traffic is absolutely awful right now with this

> closure. Fingers crossed thpugh that this helps

> spur residents on to vote for a CPZ. As the

> consultation closes next week, I hope thos

> happens, as it will help quieten down the wider

> roads anyway without the heavy traffic looking for

> spaces and to get past the .


You're very much deluded if you think CPZ will help in any way around the area... really think about it and be careful what you wish for - once it's in...*shrugs

I lived in Camberwell, north of the bridge when it was closed (due to structural issues). It was a nightmare. Network Rail promised that they would reopen it and as a temporary measure it was reduced to one lane. The same has now happened on Windsor Walk. Regardless of whether or not one thinks that reducing traffic to a single lane, or closing access to a road entirely is a good idea or not, this is not how such decisions should be made. I wonder how many crossings need to close before the people charged with their maintenance are actually held to account.
we live off the upper end of Camberwell Grove. Closure of the bridge means that I can't shop in Camberwell en route into town as it takes so long to drive round. I was told yesterday by a neighbour that the closure will be for five years! how long does it take to rebuild one tiny bridge?

Last Thursday a lorry came up Chadwick Road and could not move because of the traffic from Camberwell Grove. Chadwick Road was shut for approx 40 minutes.


The lorry had to reverse the whole length of the road from the railway bridge.


Jams are now the norm on the road.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • That a shocking story.  Spurs?  You appear to be lost.  Haringey is very much the other side of the river.  
    • Every year they ask for more and every year it is an exhausting process pushing back on that for local residents and councillors. What annoys me is that at the post event consultation/ feedback this year, I specifically asked them if the rumours around applying for two weekends next year were true. They told me no. So that was a lie. Anyway, we go again. 
    • Double In New or great condition  Or super comfortable air bed Any1 pls
    • Rant ahead: You're not one of them but unfortunately, there's a substrate of posters here that do very little except moan and come up with weird conspiracy theories. They're immediately highly critical of just about any change, and their initial assumption is that everyone else is a total fucking contemptible idiot. For example: don't you think that the people who run the libraries will have considered the impact of timing of reconstruction on library users? (In fact, we know they have - because they've made arrangements at other libraries to attempt to mitigate the disruption). After all, these are the people that spend their whole working week thinking about libraries and dealing with library users (and the kids especially). You don't go into the library game for the chicks and fame - so it's fair to assume that librarians are committed to public service and public access to libraries, including by kids. Likewise the built environment people (engineers, architects, construction managers, project managers, construction contractors, subcontractors or whoever is on this job) are told to minimise disruption on every job they do. The thing that occurs to us as amateurs within 30 seconds of us seeing something is probably not something a full time professional hasn't thought about! Southwark Council, the NHS, TfL, Dulwich Estate, Thames Water, Openreach - they're not SPECTRE factories filled with malevolent chaosmongers trying to persecute anyone. They're mostly filled with people who understand their job and try to do their best with what they've been given - just like all of us. Nobody is perfect or immune from challenge, and that's fair enough, but why not at least start from the assumption that there's a good reason why things have been done the way they have? Any normal person would be pleased that their busy, pretty, lively local library is getting refurbished, and will have more space and facilities for kids and teens, and will be more efficient to run and warmer in winter. But no, EDT_Forumite_752 had kids who did an exam 20 years ago, and this makes them an expert on library refurbishment who can see it's all just stuff and nonsense for the green agenda and why can't it all be put off... 😡😡😡
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...