Apologies if anyone has already posted about this - I couldn't see anything.


The bridge on Camberwell Grove has been closed and will remain closed to all vehicle traffic for at least 6 months. The Council hopes to have it open for 2-way cycle traffic by Friday.




The roadworks on Lyndhurst Way have been suspended as the combination of the bridge closure and roadworks have left the area around Lyndhurst Grove and Lyndhurst Way virtually gridlocked at times.


Avoid the area if possible.


GM99

Also at the bottom of Chadwick Road where it joins Lyndhurst Way, Southwark has allowed construction work to build houses entailing built storage structures into the road which has closed off half the road and 50 ft of pavement which is causing traffic build up. All it takes is one large lorry and that is it.
Not surprising given that many trucks try and squeeze over it on fairly regular basis so the bridge is probably failing. It would not surprise me if the six months turns into a permanent closure. A boon to the residents of Camberwell Grove, but a massive pain for anyone living around Bellenden - which was chaos last night thanks to the through traffic being rerouted down and along Lyndhust, then up via Bellenden, Maxted, Adys etc, rather than up the Grove and then Dog Kennel Hill.

If one can go back a few years the residents of Camberwell Grove tried to get the bridge closed but fortunately a mass turnout of residents at a meeting in the chapel on the Grove put a stop to this.


British Rail at that meeting promised to reinstate a new bridge as the old one could not handle the weight of large vehicles, hence the measures there now, and the measure that is now there was only temporary.


No doubt Camberwell Grove residents will again be working behind the scenes to make your fears come true. The main reason they offered up was it was a rat run. At that meeting it was rather like the film independence Day. One day it was all quiet and not a vehicle in sight, they all went to bed and the next day traffic that did not exist before they bought suddenly appeared.


Camberwell Grove has alway been a major highway from the moment it was built and should continue as such. This reason was excepted 100% by all parties concerned. The side roads cannot handle the traffic.


Has anyone actually seen any official reasons and data to support the current closure?


With Southwark Road plans these days one has to be very vigilante as things just get passed on a TMO.

I remember that meeting well. The Camberwell Grove residents played a dirty but skilful game then and they'll do so again no doubt. They are a powerful, well organised and resourceful bunch. But were defeated ultimately by residents of Lyndhurst Grove and the toast rack roads.

We used to live on CG (at the top end) and when the bridge was completely closed for all that time it was a huge pain. When it reopened with the road narrowing necessitated by the weak bridge, it was perfect. Access both ways but prevention of oversized vehicles using the Grove. There's no room for passing for large vehicles in several places, so opening it with no width restrictions would be horrendous.


Now it's closed again and we live in Camberwell (below the bridge), it's horrendous again.


They need to strengthen the bridge, open the rod and maintain a width restriction.

As is with the road restriction is perfect. Unfortunately common sense always seems lacking when they have their own agendas.


Yesterday walking through Grove Park via Chadwick Road the traffic was horrendous and having the refuse collection taking place traffic came to a standstill till they reached the bottom.

DuncanW Wrote:

-------------------------------------------------------

> Now it's closed again and we live in Camberwell

> (below the bridge), it's horrendous again.

>

> EdCam - are you a troll?


Ha! Not literally "below" I hasten to add. Although if you're a goat, watch yourself around these parts. I live between CG and what the estate agents nauseatingly call "the toast rack". About where you'd put the marmalade.


Yup - Lyndhurst Grove/Chadwick etc. is awful because of this.

as a toast rack resident, I can confirm that traffic is absolutely awful right now with this closure. Fingers crossed thpugh that this helps spur residents on to vote for a CPZ. As the consultation closes next week, I hope thos happens, as it will help quieten down the wider roads anyway without the heavy traffic looking for spaces and to get past the .
  • 3 weeks later...

The introduction of restricted parking on Lyndhurst/Shenley etc will not really help. All the residents living 'below' the road closure have to do a massive tour to get to Sainsbury's or Herne Hill.


I have a feeling this 'temporary' closure of the bridge will turn in to a permanent one just like the one at DKH station, there just doesn't seem to be the will nor money to actually maintain/repair these bridges.

As people have pointed out at the last meeting held regarding this bridge, British Rail, Southwark etc all agreed that it would be replaced.


If people can remember it was at the same time as the Borough had its new bridge swung in.


It was mentioned that this could be done.


Agree residents on Camberwell Grove will do all they can to stop the Grove opening. Their last wheeze was having a Toll gate like Dulwich. It was laughed out of court.

Stopping Cyclists riding over looks very unnecessary.

But then all these Southwark road works are managed and supervised by "specialists" who's main objective is to cause as much unnecessary disruption as possible, for as long as possible and to be as expensive as possible.

Brown paper envelopes system must oil the way. ;)

Anyone remember Peckham Rye and the unnecessary diversion and road works that aided the death of that young girl ... as dangerous as possible too ..

fortunately and hopefully extra fatalities don't look like they've been built into this (mole hill to mountain) project.


Seriously it could be replaced in a couple of months in almost any other country couldn't it?

I will never forget the little girl who needlessly died at the lights by peckham rye. My daughter was the same age and a mum from school lay with her whilst she passed away.

It haunted us all for a long time and is still upsetting. A tragic waste of life because although the work had finished the workmen hadn't removed the temp lights.

jimlad48 Wrote:

-------------------------------------------------------

> as a toast rack resident, I can confirm that

> traffic is absolutely awful right now with this

> closure. Fingers crossed thpugh that this helps

> spur residents on to vote for a CPZ. As the

> consultation closes next week, I hope thos

> happens, as it will help quieten down the wider

> roads anyway without the heavy traffic looking for

> spaces and to get past the .


You're very much deluded if you think CPZ will help in any way around the area... really think about it and be careful what you wish for - once it's in...*shrugs

I lived in Camberwell, north of the bridge when it was closed (due to structural issues). It was a nightmare. Network Rail promised that they would reopen it and as a temporary measure it was reduced to one lane. The same has now happened on Windsor Walk. Regardless of whether or not one thinks that reducing traffic to a single lane, or closing access to a road entirely is a good idea or not, this is not how such decisions should be made. I wonder how many crossings need to close before the people charged with their maintenance are actually held to account.
we live off the upper end of Camberwell Grove. Closure of the bridge means that I can't shop in Camberwell en route into town as it takes so long to drive round. I was told yesterday by a neighbour that the closure will be for five years! how long does it take to rebuild one tiny bridge?

Last Thursday a lorry came up Chadwick Road and could not move because of the traffic from Camberwell Grove. Chadwick Road was shut for approx 40 minutes.


The lorry had to reverse the whole length of the road from the railway bridge.


Jams are now the norm on the road.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • why do we think we have the right for the elected local council to be transparent?
    • Granted Shoreditch is still London, but given that the council & organisers main argument for the festival is that it is a local event, for local people (to use your metaphor), there's surprisingly little to back this up. As Blah Blah informatively points out, this is now just a commercial venture with no local connection. Our park is regarded by them as an asset that they've paid to use & abuse. There's never been any details provided of where the attendees are from, but it's still trotted out as a benefit to the local community.  There's never been any details provided of any increase in sales for local businesses, but it's still trotted out as a benefit to the local community.  There's promises of "opportunities" for local people & traders to work at the festival, but, again, no figures to back this up. And lastly, the fee for the whole thing goes 100% to running the Events dept, and the dozens of free events that no-one seems able to identify, and, yes, you guessed it - no details provided for by the council. So again, no tangible benefit for the residents of the area.
    • I mean I hold no portfolio to defend Gala,  but I suspect that is their office.  I am a company director,  my home address is also not registered with Companies House. Also guys this is Peckham not Royston Vasey.  Shoreditch is a mere 20 mins away by train, it's not an offshore bolt hole in Luxembourg.
    • While it is good that GALA have withdrawn their application for a second weekend, local people and councillors will likely have the same fight on their hands for next year's event. In reading the consultation report, I noted the Council were putting the GALA event in the same light as all the other events that use the park, like the Circus, the Fair and even the FOPR fete. ALL of those events use the common, not the park, and cause nothing like the level of noise and/or disruption of the GALA event. Even the two day Irish Festival (for those that remember that one) was never as noisy as GALA. So there is some disingenuity and hypocrisy from the Council on this, something I wll point out in my response to the report. The other point to note was that in past years branches were cut back for the fencing. Last year the council promised no trees would be cut after pushback, but they seem to now be reverting to a position of 'only in agreement with the council's arbourist'. Is this more hypocrisy from 'green' Southwark who seem to once again be ok with defacing trees for a fence that is up for just days? The people who now own GALA don't live in this area. GALA as an event began in Brockwell Park. It then lost its place there to bigger events (that pesumably could pay Lambeth Council more). One of the then company directors lived on the Rye Hill Estate next to the park and that is likely how Peckham Rye came to be the new choice for the event. That person is no longer involved. Today's GALA company is not the same as the 'We Are the Fair' company that held that first event, not the same in scope, aim or culture. And therein lies the problem. It's not a local community led enterprise, but a commercial one, underwritten by a venture capital company. The same company co-run the Rally Event each year in Southwark Park, which btw is licensed as a one day event only. That does seem to be truer to the original 'We Are the Fair' vision, but how much of that is down to GALA as opoosed to 'Bird on the Wire' (the other group organising it) is hard to say.  For local people, it's three days of not being able to open windows, As someone said above, if a resident set up a PA in their back garden and subjected the neighbours to 10 hours of hard dance music every day for three days, the Council would take action. Do not underestimate how distressing that is for many local residents, many of whom are elderly, frail, young, vulnerable. They deserve more respect than is being shown by those who think it's no big deal. And just to be clear, GALA and the council do not consider there to be a breach of db level if the level is corrected within 15 minutes of the breach. In other words, while db levels are set as part of the noise management plan, there is an acknowledgement that a breach is ok if corrected within 15 minutes. That is just not good enough. Local councillors objected to the proposed extension. 75% of those that responded to the consultation locally did not want GALA 26 to take place at all. For me personally, any goodwill that had been built up through the various consultations over recent years was erased with that application for a second weekend, and especially given that when asked if there were plans for that in post 2025 event feedback meetings (following rumours), GALA lied and said there were no plans to expand. I have come to the conclusion that all the effort to appease on some things is merely an exercise in show, to get past the council's threshold for the events licence. They couldn't give a hoot in reality for local people, and people that genuinely care about parkland, don't litter it with noisy festivals either.   